Bath: layout and amazing solutions for compact buildings. The layout of the baths with a separate location of the sink and steam room Bath 4 4m from turnkey timber

For small area this bath looks like ideal option. The compact design can accommodate everything you need for a good rest. Functional bath 4 by 4 implies an interesting layout inside. About the details of its construction, features of decoration and best examples design will be discussed in more detail later.

Typical characteristics of a 4x4 structure

When drawing up a technical project, one should be guided by the following characteristics:

  • the area of ​​​​the bath with an eye to the foundation is about 21.6 square meters. m;
  • the distribution of the area can occur as follows: steam room - about 4 square meters. m, dressing room - 3 sq. m, shower room - 3.5 sq. m, terrace - up to 3 sq. m;
  • as for the ceiling, it is important to observe a height of 2 m.

Attention! The height of the ceiling does not depend on the choice of the owner - both a one-story building and a building with a veranda must be equipped in the same way.

The classic dimensions are easy to adjust, taking away useful meters from the same shower room in favor of the steam room. Or leave everything at the mercy. However, in this case, you will need to take into account a couple of meters for a flight of stairs.

Bath construction

Consider each stage of the construction of the bath separately:

A reliable basis for the building of the bath will be a strip foundation. In this case, it is desirable to find the freezing point of the soil so that the structure is as strong as possible. If ground water run too high, the owner should pay attention to screw piles. A variant with the installation of a columnar base is also allowed, since here it is also supposed to be installed below the freezing point of the soil.

Attention! Waterproofing is a must!

If you choose between assembling a log house or a brick, then you should be aware of the laboriousness of installing the latter. All elements of the selected material must be marked and adjusted to fit the project data. Beam before laying must be processed special composition. In this case, you can do without fastening, since the own weight will firmly hold the structure. In addition to the bars, it is important to provide bituminous mastic and for the foundation. This will protect the wood material from moisture.

When the first crown of future walls is laid, the diagonal of the structure should be checked again. After that, with the help of dowels and a jute sealant, all rows are connected. The gaps are carefully sealed. Under the roof itself, you need to install transverse logs on the last row of bars.

Features of the work

  1. Internal partitions are installed simultaneously with the laying of the crown. To do this, you need to mark in advance the place for the landing recess. Usually a partition separates the steam room and shower room from the dressing room. It is better to separate the steam room itself portable design so as not to reduce the strength of the log house with another cut.
  2. For a bath of this size, it is enough to provide two windows: one in the steam room, the other in the dressing room. An alternative option is to install products in the steam room, and windows in the shower room. The latter must be provided with ventilation.
  3. The truss system must be made of quality wood. At the same time, it is advisable not to abuse complex structures, which excessively load the foundation of the bath. An interesting option seems hip design when the attic acts as a recreation area. A single or gable roof model suggests the possibility of using almost any material. The first option looks more economical, but then the owner will be left without a recreation area.

Advice. The weight load on the truss system decreases with a decrease in the angle of inclination.

Final steps

The internal improvement of the bath allows the owner to show his own imagination. Although the same profiled timber does not need any decor. If the wood material has not really been processed, then siding or stone will easily hide its shortcomings. Often the interior of the bath is made in lining or similar materials. However, the greatest benefit is wood materials from deciduous trees (for example, linden). themselves Finishing work may require the owner to install a batten with waterproofing. The latter can be abandoned only in subtropical regions with a mild climate. To low temperatures, a good tree species is quite resistant.

And don't forget about such equipment as chimney. The place of its withdrawal should be designated even before the start internal works in the bath - after the construction of the object and heating system. There are also lovers of stoves-heaters, which were made by our grandfathers. However, the latter require a solid foundation and the presence of a chimney. They are made in the walls, which are then carefully insulated with practical compositions. This is necessary both to preserve heat and to protect the outgoing pipe from overheating.

At the final stage installation work plumbing, electricity and plumbing should be connected. After completion of these operations, the bath can be considered ready for use.

The design of a four-by-four bath project is not much different from larger buildings. It also requires compliance with banal safety rules. The owner has the opportunity for imagination only when finishing the interior.

Bath project example: video

Functional beautiful buildings on the land delight the owners and provide the opportunity to use them all year round. These buildings include baths 4 by 4. Good size medium capacity. It will accommodate 3-4 people comfortably. Such dimensions are suitable for families and receptions. You can invite relatives and carry out procedures together.

What is it worth building bath complexes from?

Profiled timber quality raw materials. It has the following advantages:

  • low thermal conductivity - this contributes to a long cooling process. Heat is stored for a long time, there will be no losses.
  • a variety of designs - there are square, rectangular and intricate solutions. You can build a frame of irregular shape.
  • quick assembly - experienced craftsmen complete the work in 2 weeks.
  • slight shrinkage - gives the right to immediately use the object.
  • decorative appearance steam rooms - does not need facade finishing. In this case, it is necessary to treat the tree with protection against moisture and fire.
  • environmental friendliness - wood is a clean material. It allows the building to breathe. A healthy microclimate is created in a wooden structure.
  • low prices - savings occur in comparison with a log. This building will be cheaper if the contractor has his own production.
  • baths made of 4x4 timber are durable - they cost more than 50 years without requiring additional investments.

The company "Domostroy" fulfills orders on its own equipment, processes lumber and prepares them for construction and installation work with their own hands. Therefore, we provide turnkey services.

Call the office and place an order. We will make an estimate immediately. We have discounts. We give gifts. Come, our managers will acquaint you with ready-made photos. According to them, you will select the required parameters.

The price of building a log cabin of a 4x4 bath without finishing under the roof is 211,000 rubles

  • The foundation is columnar. 2 blocks in a pedestal (for one-story houses) and 4 blocks in a pedestal on cement screed(for houses with an attic). Concrete blocks, full-bodied, 200x200x400 mm in size. Pedestals are installed on a rammed sand cushion. Sand (PGS) is provided by the customer.
  • External walls - profiled timber natural humidity section 145x90 mm (wall thickness - 90 mm) Profile "block house" or straight.
  • In total, there are 16 crowns in the log cabin of one-story baths. There are 17 crowns in the log house of baths with an attic.
  • An open terrace (if any) on supports made of planed timber with a section of 100 * 150 mm, with shrink jacks. Fencing - a handrail from a planed bar with a section of 40 * 100 mm. Steps at the entrance.
  • The height of the ceiling of the first floor in cleanliness (from the floor log to the floor beam) for one-story baths is 2.15 m (+/-50mm); for saunas with an attic 2.29m (+/- 50mm)
  • The second floor is an attic. Clear attic ceiling height (from floor beam to ceiling beam) - 2.25 m
  • The height of the roof in the ridge for one-story baths is 1.20 m.
  • The pediments are a frame made of boards of natural humidity with a section of 150 * 40 mm, 100 * 40 mm. Exterior finish gables - lining (spruce / pine AB) 17 * 90 mm. Wind protection - NANOIZOL "A" (for buildings with an attic).
  • In the pediments of one-story buildings, a door (1 pc.) And ventilation hatches (1 pc. For each pediment, under the ridge) are installed.
  • Ventilation hatches are installed in the gables of buildings with an attic (3 pieces for each gable).
  • Eaves and roof overhangs 200 mm wide (for one-story buildings) and 300 mm (for buildings with an attic). Cornices and overhangs are hemmed with clapboard (spruce / pine AB) 17 * 90 mm.
  • The device of window and doorways with dressing wreath, without installation of casing bars.
  • Assembly of the house / bath at the customer's site.

The price of a turnkey 4x4 bath with a foundation and a stove is 328,000 rubles

  • The foundation is columnar. 2 blocks in a pedestal (for one-story baths) and 4 blocks in a pedestal on a cement screed (for baths with an attic). Concrete blocks, full-bodied, 200x200x400 mm in size. Pedestals are installed on a compacted sand cushion. Sand (PGS) is provided by the customer.
  • Waterproofing - roofing material in one layer.
  • Strapping - a bar of natural moisture with a section of 150x100 mm. On the outer perimeter, the strapping is laid in two rows. Beam processed protective composition.
  • Floor logs - a board of natural moisture with a section of 40x150 mm per edge, with a step of 600 mm.
  • Draft floor - a board of natural humidity with a section of 22x100mm. Steam, waterproofing - NANOIZOL S.
  • Floor insulation - 100mm KNAUF/URSA mineral wool (or equivalent). Vapor barrier - NANOIZOL V.
  • Finished floor of the first floor - dry tongue-and-groove batten(spruce/pine AB) 36mm thick. Each fifth board is fastened with screws (for the possibility of further flooring).
  • External walls - profiled beam of natural humidity with a section of 145x90 mm (wall thickness - 90mm) Profile "block house" or straight. There are 16 crowns in total (for one-story baths) and 17 crowns (for baths with an attic).
  • Partitions of the first floor - profiled beam of natural humidity with a section of 145x90 mm, straight profile. They cut into external walls with a depth of up to 30mm.
  • Mezhventsovy heater– jute cloth 6mm thick
  • Interconnection - on a metal dowel (building nail 6x200mm, 250mm).
  • Gusset- "in half a tree." The outer corners of the log house are sewn up with clapboard (spruce / pine AB) 17 * 90 mm in two rows.
  • An open terrace (if any) on supports made of planed timber with a section of 100 * 150 mm, with shrink jacks. Fencing - a handrail from a planed bar with a section of 40 * 100 mm filled with carved balusters. Steps at the entrance.
  • Terrace floors - dry tongue-and-groove floorboard (spruce/pine AB) 36mm thick. Fasten with self-tapping screws to each board. Boards are laid in 5 mm increments.
  • Terrace ceilings - lining (spruce / pine AB) 17 * 90 mm. Vapor barrier - NANOIZOL V.
  • The ceiling height of the first floor in cleanliness (from floor to ceiling) is 2.10 m (+/- 50mm) - for one-story baths and 2.25 m (+/-50mm) - for baths with an attic.
  • The filing of the ceiling of the first floor (except for the steam room) - lining (spruce / pine AB) 12.8 * 88 mm. (joint for layout is allowed)
  • The second floor is an attic. Clear attic ceiling height (from floor to ceiling) - 2.20 m
  • Floor insulation - 100 mm KNAUF / URSA mineral wool (or equivalent). Vapor barrier NANOIZOL V.
  • Attic floors - dry tongue-and-groove floorboard (spruce / pine AB) 36mm thick. Each fifth board is fastened with screws (for the possibility of further flooring).
  • Sheathing of the walls and ceiling of the attic - lining (spruce / pine AB) 12.5 * 88 mm (a joint for layout is allowed).
  • Attic wall insulation - 100mm ROCKWOOL basalt mats (or equivalent). Vapor barrier - NANOIZOL V.
  • Partitions of the attic - a frame made of a bar of natural moisture with a section of 40 * 75 mm, sheathed on both sides with clapboard (spruce / pine AB) 12.5 * 88 mm. Partitions are not insulated.
  • Rafters - farms from a board of natural humidity with a section of 150x40mm., 100x40mm. Are established with a step of 900-1000 mm.
  • The pediments are a frame made of boards of natural humidity with a section of 150 * 40 mm, 100 * 40 mm. External finishing of pediments - lining (spruce / pine AB) 17 * 90 mm. . Wind, moisture protection - NANOIZOL "A" (for baths with an attic).
  • In the pediments of one-story baths, a door (1 pc.) And ventilation hatches (1 pc. For each pediment, under the ridge) are installed.
  • Ventilation hatches are installed in the gables of baths with an attic (3 pieces for each gable).
  • Lathing - a board of natural moisture with a section of 22 * ​​100 mm, with a step of 300 mm. Counter-lattice - rail 20 * 40 mm, along the slopes of the rafters.
  • Roofing - ONDULIN (burgundy, brown, green) or galvanized corrugated board. Underroofing vapor barrier - NANOIZOL S.
  • Cornices and roof overhangs 200 mm wide (for one-story baths) and 300 mm (for baths with an attic). Cornices and overhangs are hemmed with clapboard (spruce / pine AB) 17 * 90 mm.
  • The staircase to the attic is single-flight, on bowstrings made of planed timber with a section of 145 * 90 mm. Floorboard steps. The handrail and the fence in the attic are a planed bar with a section of 40 * 100 mm.
  • Finishing the walls and ceiling of the steam room - lining (aspen B) 14 * 90 mm (a joint for layout is allowed). Reflective insulation on a foil basis - NANOIZOL FB. Counter rail - 10 * 40 mm ( ventilation gap– 10 mm). Before sheathing, the timber base of the walls is treated with a protective composition for baths and saunas NEOMID 200.
  • Two-tier shelves made of planed board (aspen B) 28*90 mm. The width of the step - 40 cm (height - 50 cm); lounger width - 60 cm (height - 110 cm).
  • Installation of the ERMAK 12 / ERMAK 16 furnace with a hanging tank (stainless steel 35 l) for heating water.
  • The basis of the furnace - a brick in one row. Cutting furnace portal - brick.
  • Fire insulation - basalt cardboard, ceiling and roof passages, a reflective screen made of smooth galvanized steel on basalt cardboard, inflow sheet.
  • The flue - vertical, with an output in a roof through a ceiling. Starting pipe - stainless steel 0.5 mm, stainless steel gate valve, stainless steel starting adapter, sandwich pipes 115 * 200 mm (stainless steel 0.5 mm * galvanized 0.5 mm), galvanized head.
  • Installation in a car wash shower tray 800*800 mm with siphon. The outlet of the drain outside the perimeter of the bath is a sanitary PVC pipe with a diameter of 50 mm.
  • Windows - wooden, double-glazed, with a seal and fittings (screw hinges, twist locks). Inward-opening doors. Dimensions (h*w) 1200*1500 mm; 1200*1000 m; 1200*600mm; 600*600mm; 400*400 mm. Windows are installed in casing boxes.
  • Entrance door - wooden, paneled, deaf (spruce / pine A). Size (h * w) 1800 * 800 mm (for one-story baths; 2000 * 800 mm (for baths with an attic). Handles, hinges. On front door a padlock is installed.
  • Doors interroom - bath, frame (aspen A). Size (h*w) 1750*750 mm. Handles, hinges.
  • in windows and doorways casing bars (swarms) are installed.
  • Sealing of corners, joints, junctions - plinth spruce / pine A / aspen AB.
  • Finishing windows, doors - trim spruce / pine A on both sides, aspen AB
  • Nails for fixing parts - construction black.
  • Nails for fastening lining - galvanized 2.5x50 mm
  • Nails for fastening the plinth, layouts - finishing galvanized 1.8x50 mm.
  • Loading, delivery up to 400 km from Pestovo, Novgorod region, unloading of a set of material.
  • Assembly of the bath at the customer's site.
  • BONUS. Steam room accessories. Stones - gabbro-diabase 40 kg.

We have compiled for you a convenient table of differences in the configuration of baths for shrinkage and turnkey.

COSTRUCTION

SHRINK

FULL CONSTRUCTION

Columnar foundation of concrete blocks 200*200*400

Yes

Yes

Double strapping from a bar 150*100 mm

Yes

Yes

Floor logs from a board 40 * 150 on the edge with a step of 600 mm

Yes

Yes

Draft floor from a board 22*100/150 mm

No

Yes

Floor insulation with hydro and vapor barrier

No

Yes

Finished floor - dry tongue-and-groove floorboard 36 mm

No

Yes

Walls and partitions made of profiled timber of natural humidity with a section of 145 * 90 mm (wall thickness - 90mm)

Yes

Yes

Assembling a log house on steel dowels

Yes

Yes

Corner connection - in half a tree

Yes

Yes

Mezhventsovy heater - jute

Yes

Yes

Rafters - trusses from a bar 40 * 100/150 mm with a pitch of 900/1000 mm

Yes

Yes

Lathing - board 20*100/150 mm

Yes

Yes

Roofing– ondulin / galvanized corrugated board C20

Yes

Yes

Roof eaves and overhangs are hemmed with clapboard spruce / pine AB

Yes

Yes

Window and door openings with dressing crown, without installation of casing bars

Yes

No

Window and door openings with installation of casing bars

No

Yes

Installation of windows and doors

No

Yes

Ceiling filing - lining spruce / pine AB

No

Yes

Insulation + vapor barrier of floors / attic

No

Yes

Finishing the walls and ceiling of the attic - lining spruce / pine AB

No

Yes

Finishing the walls and ceiling of the steam room - lining aspen AB + shelves

No

Yes

Furnace and chimney installation

No

Yes

Installation in the washing shower tray 800 * 800 mm with a siphon. Conclusion of the drain for the perimeter of the bath

No

Yes

Staircase to the attic

No

Yes

Finishing: plinth, platbands

No

Yes

Loading a set of material, its delivery up to 400 km from our base, unloading at the customer's site

Yes

Yes

Name

Cost, rub)

unit of measurement

Foundation installation on screw piles or reinforced concrete foundation

8-921-930-69-80,
8-926-742-95-01

decorative trim plinth - pickup ()

1000-1600

running meters

Installation of reinforced concrete slabs 500*500*100 mm for support pedestals ( )

PCS.

Protection (lining board) of the first row of strapping from a larch board 50 * 150 mm ( )

running meters

Protection (lining board) of the first row of strapping made of larch board 50 * 200 mm ( )

running meters

Double strapping from timber 150x150mm

running meters

Double strapping from timber 150x200mm

running meters

Device floor log from a bar 150x100mm

running meters

Larch floor installation terrace board"velveteen" (for open terraces)()

2000

m*2 floor

Installation of finishing floors made of tongue-and-groove larch floorboard 27 mm ( )

2000

m*2 floor

External walls made of profiled timber with a moisture content of 145x140mm, partitions made of profiled timber. humidity section 145*90 mm

2500

running meters exterior walls

Exterior walls and partitions made of profiled timber chamber drying section 145x90 mm

2300

running meters exterior walls

And baffles

External walls made of profiled kiln-dried timber with a section of 145x140 mm, partitions made of profiled kiln-dried timber with a section of 145x90 mm

4000

linear meters of external walls

Exterior walls made of profiled timber. humidity with a section of 145x190mm, partitions made of profiled timber eat. humidity section 145*90 mm

4500

linear meters of external walls

External walls made of profiled chamber-drying timber with a section of 145x190mm, partitions made of profiled chamber-drying timber with a section of 145*90mm.

5300

linear meters of external walls

A set of kiln-dried lumber ( )

1000

m * 2 building area

Conjugation of crowns on a wooden dowel

1000

Assembling a log house using a SPRING ASSEMBLY FORCE ( )

2000

running meters external walls and partition walls

Assembling a log house with a screed of crowns in height with steel studs

1500

running meters external walls and partition walls

Corner connection "groove-thorn" ( warm corner)

6000

one corner of the log

Corner connection “in the bowl” ( )

from 30 000

house kit

Interventional insulation - holofiber()

300/450/600

running meter external walls of the log house

Increasing the ceiling height by 14 cm (+ one crown in the log house)

500/750/1000

running meters exterior walls

and partition walls

Insulation 150mm

m * 2 insulated area

The device of a ladder on a bowstring made of glued laminated timber, with wide steps, turned pillars, balusters and a figured handrail.

25000

PCS.

Roofing - metal tiles RAL 3005 ,5005,6005,7004, 7024,8017)

m*2 roof

Roofing - corrugated board with polymer coated (RAL 3005,5005,6005,7004, 7024,8017)

m*2 roof

Installation of a drainage system (PVC, DEKE)

1200

running meters roof slope

Installation of corner snow barriers ( )

running meters roof slope

Installation of tubular snow barriers ( )

1300

running meters roof slope

Attic device: sparse flooring from edged board on ceiling beams, a door in one of the gables + skylight in the opposite pediment

m*2 ceiling

External finishing of pediments - block house spruce / pine AB 28 * 140

m * 2 gable area

External finishing of gables - imitation of timber 18*140 mm

m * 2 gable area

Treatment of the entire building with a fire-retardant composition NEOMID ( )

m * 2 building area

Surface treatment with NEOMID terrace oil ( )

m*2 floor

Treatment of the walls and ceiling of the steam room and washing varnish NEOMID "for baths and saunas" ( )

m * 2 walls and ceiling

Processing the ends of the log house with NEOMID TOR PLUS ( )

opening/corner

Treatment of shelves in the steam room with NEOMID oil ( )

1000

m*2 shelf

Finishing of walls and ceiling with larch lining 14*90mm ( )

1500

m * 2 walls and ceiling

The device of the "flowing floor" in the washing ( )

5000

m*2 floor

Finishing with a pair of clapboards OSINA A, including shelves - OSINA A

m * 2 walls and ceiling

Finishing with a double clapboard LIPA A, including shelves - LIPA A

1200

m * 2 walls and ceiling

Finishing with double clapboard LIPA EXTRA, including shelves - LIPA Extra more more)

35 000

PCS.

Installation of PVC windows with single-chamber double-glazed windows

from 4000

PCS.

Installation of PVC windows with double-glazed windows

from 5000

PCS.

Installation of a heat exchanger in the ERMAK furnace, installation of an external tank (stainless steel 60l) on the washing wall, supply hot water metal-plastic pipes

20000

PCS.

Installation of a tank (stainless steel 50l) on a pipe above the stove, with a tap outlet to the washing room

13 000

PCS.

Installation of another ERMAK oven (

12 000/16000

set

Chimney device made of stainless steel 0.8 mm thick (protective screen, stainless steel inlet sheet included)

16 000/20000

set

Delivery over 400 km from Pestovo, Novgorod region.

km

Construction change house 2.0 * 3.0 / 4.0 m ()

from 21 000

PCS.

The whole country rests on such workers

Alexey Gennadievich!!! Due to the lack of time, I could not write to you in any way - many thanks for the work of your employees in the construction of the bathhouse, two young men, unfortunately, I don’t know their names, they worked clearly and harmoniously, the quality of the bathhouse is EXCELLENT !!! The whole country rests on such workers. All friends and relatives also noted the impeccable work of the guys, as a result of which they dreamed of a bathhouse.

The guys built us an amazing bath

I want to express my deep gratitude to Alexey (general director), Zorin Sergey and Chistyakov Vladimir (builders)! In early August, the guys built us an amazing bathhouse, taking into account all our wishes. The delivery of materials was carried out on time, the construction was completed even ahead of the time agreed earlier, the quality of materials and work on highest level. In general, just a fairy tale! I advise you to build only with Russian carpenters!

"Price quality"

The work is pleasing to the eye. Fast, high quality, on time. I thank the team of guys (Eugene, Dmitry, Sergey) and CEO Alexey Roslov for the work done. I ordered a bathhouse with an attic 6x6 project B-20 with minor changes, “for shrinkage”. All work was completed ahead of schedule and with high quality. All my wishes were taken into account. I was very pleased with Alexey Roslov's attitude to his work. He always promptly and competently answered all my questions, settled controversial issues. The team, despite the young age of the guys, worked quickly and smoothly, at the end they gave advice on caring for the timber and conservation for the winter. Next year I will do the finishing with the same team. "Russian Plotniki" wins in all positions in comparison with other large companies. “Price-quality” is about them. Again thank you very much. I will recommend to everyone.

They built a house for me in 2018, according to my project, by professionals in their field. The project itself is somewhat more expensive than its competitors, but in our village they built 1 more house and the owners were satisfied.

They ordered the construction of a bathhouse, they did it in the shortest possible time, without any complaints about the work of the team.

Full cycle from the production of material to the assembly of the house is perfectly organized. Quality, professionalism at the highest level. I recommend.

It is very important to find your manager, who will advise not only at the conclusion of the contract, but also during construction. We talked with Igor, as a result, the bath is ready on the site, we use it, everything is fine. Thank you.

Great home, great service! Everyone was helpful and helpful with the selection. You can see everything live - we went to a facility under construction similar to ours, where they saw how they work, only after that they decided to build. Thank you for the patience of managers and builders that answered all the questions!

In 2018, we ordered a bathhouse. We are very satisfied with the work of the employees of this company. Starting with the estimate and ending with a team of builders. We were lucky for the action, we received a sauna stove as a gift!

Thanks for the sauna house. On the site one price is indicated, but in fact it turns out more. But it’s understandable that the price is indicated for the very minimum, like everyone else on the Internet, if you want to comfortably pay extra for extras. In general, "thank you" to the builders.

The desire to acquire a bathhouse in which you can take a steam bath with the whole family, or mentally spend time in the company of friends - is born immediately after the happy acquisition land plot where you can make your dream come true. Those developers who completely entrust the construction and landscaping to a contractor or guests from the Central Asian republics, delve into the essence of design for the first time - at the stage of choosing a beautiful house / bathhouse, drawn in Photoshop, the second - when the picture in a glossy magazine does not critically coincide with the creation of hired hands builders. To avoid such a traumatic discrepancy, you can independently prepare a 4x4 bath project and proceed with its implementation, spending a minimum of effort and money, since such a project will take into account not the interests of the designer and the inevitable margin, but the preferences of the owner, who carefully saves every penny.


Bath 4x4

Project, plan, drawing - what's the difference?

For many developers who first encountered the need to prepare a project for a simple structure on garden plot, is a revelation that a plan is different from a drawing, and a project is not only a set of pictures with dimensions, but something much more! It is not difficult to develop a 4x4 bath project even for an owner who is unprepared and far from construction, the main thing is to understand that the project is not a sketch on a piece of paper, and not even a neat drawing. A project is a set of sequential actions that includes all stages of preparation, planning, construction, connection to communications and subsequent maintenance of a future building.

AT project documentation everything counts!


Starting with geodetic survey of a site and geological surveys, ending with the calculation of the cost of hardware - studs and staples for a stapler, which may be needed during the construction and decoration of the sauna of your dreams.

Choice of planning solution

A 4x4 bath is a small structure, but this does not mean that it can be placed anywhere on the land.


Layout option 1
Layout option 2 Layout option 3

During the operation of the bath, it is necessary to use an open combustion source - a stove. Therefore, comply with the requirements fire safety. When choosing a place where to place a bathhouse, it is necessary to proceed from the following requirements:

  • Location from the border of the site - at least 1 meter, if it is a one-story building without a foundation - the rarest case construction of a panel sauna with an electric fireplace. Or - 3 meters - in the event that the bath has a foundation, the building itself can be classified as residential. All requirements for the placement of the building can be studied by reading the following documents:

  • Communications - the most important requirement when choosing a place to build a bath! It is unlikely that anyone will be pleased - before taking a steam bath on a frosty evening on the eve of Christmas, wear for several hours ice water from a well located at the other end of the site or completely beyond its border. The bath should be located near the source of water supply and collection system Wastewater(septic). Otherwise, a situation is possible when, after bathing procedures, the beds with your favorite strawberries are flooded with soapy water or the apple tree begins to wither, which has delighted the owners with its fruits for decades.
  • Coordination with neighbors. Subject to SNiP, it is usually not necessary to coordinate the 4x4 bath project with the owners of neighboring plots. Exceptions are cases when the site is burdened with an easement. If there is a path to the neighboring site along it, a water supply system has been laid, there is a single entrance, etc. In this case, it is necessary either to change the location of the planned bathhouse, or to transfer easement encumbrances to another location.

Foundation design

In theory, the design of laying the foundation begins with geological surveys. Determine the structure of the soil, the depth of soil water, the depth of soil freezing. Based on these data, choose optimal design foundation. Most developers ignore these requirements and build the foundation on the principle of maximum cheapness, forgetting about the saying: “Cheap cheese only happens in a mousetrap!”

IMPORTANT! Neglect of the foundation device turns into thousands of costs to eliminate the flaws made during construction!

columnar or pile foundation At first glance, it seems the simplest and cheapest option. In fact - drilling pits or renting a unit for twisting screw piles can cost much more than the strip foundation from FBS. The second minus of the pile foundation is the cold floor! The cost of insulating the basement and firewood for the firebox of the bath will “eat up” all the savings when laying the foundation!


4x4 pile foundation project
Foam block foundation

Log house design

Bath 4x4 can not be called small. If it is built on the principle of a Russian steam room, then this is quite a sufficient area. If you build a sauna, it will be cramped because you have to divide 16 m2 into three rooms:

  • steam room;
  • washing;
  • Dressing room.

Agree that 5.33 m 2 for each of the rooms is a bit cramped even for one person, not to mention any company or a joint bath for the whole family.

Such small bath rationally build according to the classical Russian layout - single space combining a steam room with a washing room. The steam in such a bath is humid, rarely above 70 ° C, but on the other hand, it is healthier, easier to tolerate by women, the elderly and children, and the bath, in addition to its hygienic functions, can be used for household needs - as a room for washing and drying clothes, drying autumn clothes. blanks, as a backup living quarters in emergency situations.

Roof design

Modern lungs Decoration Materials allow you to easily arrange an attic or a second unheated floor, which is operated in warm time of the year. Depending on the imagination of the developer, the roof can have the most diverse look.

The simplest - a gable attic with a slight elevation angle is used only for drying brooms or storing inventory. Less popular shed roof. Her inconvenience affects winter time- if you arrange a slope angle that ensures independent snow melting - the bath will look ridiculous, and if you make the angle flat - you will have to clean the roof of snow several times during the winter.


Proportions gable roof baths

Hip and semi-hip roofs near the baths are a rarity. Usually, when designing, they strive for maximum cost reduction, and a hip roof is difficult to build, requires certain skills and is large in area, which affects the price of roofing material.

Drawing truss system hip roof

mansard roof- the most common solution that gives the building the look of a hearse! Unfortunately, the functionality does not match the aesthetics. When designing a bathhouse with a second floor, think about how often you will have a desire to go up to the second floor after the steam room to feed the mosquitoes there.


Mansard bath roof

Drawing up a budget for the project

The hardest part of the job is budgeting. Bath 4x4 - a fabulously beautiful dream begins to take on a material shape when the developer calculates how much it will cost him to spend a wellness pastime in the steam room.

The main mistake of an inexperienced developer is that he considers only the cost building materials. Without taking into account the costs of designing, paperwork, transport services for the delivery of building materials or the rental of special equipment: a drilling rig, a manipulator-loader, hiring workers to perform labor-intensive work.

Often the project does not take into account such "little things" as:

  • Pipes for the device drainage system baths.
  • Materials for electrical wiring.
  • Thermal insulation materials that serve to ensure fire safety.

IMPORTANT! If the sauna is equipped with an electric heater, the energy costs can be comparable to the monthly energy consumption for the rest of the household!