Many people make the choice in favor of a house with a floor and a half, since such projects have a number of advantages:

  • Saving. A full-fledged second floor requires more costs than an attic room adapted for human habitation;
    Comfort. The attic is no less comfortable than an ordinary room; during construction, the elements of the roof are additionally insulated;
  • Ecological cleanliness. One-and-a-half-story buildings, which are so popular in Moscow and the surrounding area, will be as safe for humans as other houses made of timber.

Housing of this type owes its name to the fact that the first floor, created from logs or timber, is significantly higher in height than the second, the walls of which are made of wooden panels. The area of ​​such a building is not less than that of a two-story one, but at the cost of a house for one and a half floors it compares favorably with competitors.

Projects of houses from a bar up to 100 sq.m.

In our catalog you will find ready-made projects of houses from a bar with an area of ​​6x9 meters. By choosing one of them, you can find out the cost of building a building on 1.5 floors, familiarize yourself with the layout diagram and other accompanying information.

For building a house up to 100 sq. m you can use wood of different types:

  • Larch, cedar. An expensive variety of wood that has good characteristics and gives the house a unique microclimate;
  • Conifers. One of the most affordable varieties with a beautiful texture. Needs additional treatment with antiseptic compounds;
  • Linden. This wood continues to be used in construction, but it is not very suitable for residential buildings; instead, it can be used in the construction of a bath;
  • Oak. The material is very difficult to process, so 6x9 houses are rarely built from it. In terms of its strength characteristics, it is close to natural stone, but at the same time it continues to "breathe" and perfectly stores heat.

We use the most modern building technologies, so every house created according to our projects will fully comply with the climatic conditions that distinguish Moscow and its environs.

HOUSE COMPLETION

Wall kit price includes:

Design drawings and specification of the bath (AR, KR);
- production of timber for construction. Northern forest, Kostroma region;
- waterproofing the foundation with roofing felt;
- mortgage (strapping) row of timber 150 x 150 mm;
- treatment of the mortgage crown with an antiseptic;
- external, main walls made of timber 150 x 150 mm (profiled timber 145 x 140 mm);
- internal walls made of timber 150 x 100 mm (profiled timber 145 x 90 mm);
- gables chopped from a bar 150 x 150 mm (profiled bar 145 x 140 mm);
- ceiling height: 1st floor - 2 m 70 cm, 2nd floor - 2 m 50 cm;
- connection of a bar "warm corner";
- assembly of a log house on wooden dowels according to the technology;
- mezhventsovy insulation - jute cloth;
- floor logs - from a bar of 150 x 100 mm with a step of 0.6 m;
- ceiling beams - from a bar of 150 x 100 mm with a step of 0.6 m;
- compensation jacks for the terrace, porch;
- delivery, unloading of a log house and accessories;
- installation of a house kit by an experienced team (Russians);
- quality control of materials and works.

FOUNDATION

The most suitable foundations for the construction of a log house are:

Monolithic tape;
- pile - screw;
- on reinforced concrete piles.

Our construction teams can erect any type of foundation with high quality.

ROOF

The basic equipment includes the installation of a roofing system and roofing with a temporary roof:

Rafters from edged boards 150 x 50 mm with a pitch of 0.6 m;
- installation of rafters is carried out on sliding supports;
- a crossbar for stacks from edged boards 150 x 50 mm;
- roof lathing made of edged boards 150 x 20 mm;
- roofing material (roofing material).

At the request of the client, we can perform roofing works using metal tiles, soft bitumen roofing or ondulin.

3 gifts are already included!

ABOUT PACKAGE

Our clients are offered an inexpensive basic configuration for construction "for shrinkage", which allows at the initial stage to put the log house under the roof, and in the future to start finishing work. If necessary, the company's specialists will calculate the cost of additional options.

The cost of this house is calculated taking into account the classic sawn timber 150 x 150 mm and profiled timber 145 x 145 mm. At the request of the client, the log house can be built from a larger bar. For the construction of country houses, in most cases, a profiled beam of 145 x 145 mm is used. Houses built with timber walls from 195 mm (200 mm) thick are ideal for year-round living. Increasing the thickness of the walls made of timber will reduce the heat loss of the structure. Each of the offered types of timber has its own advantages. For example, beams mechanically processed on special equipment, from the outside and inside, get a geometrically even shape and have a smooth surface, which will significantly reduce the cost of finishing work in the future. In modern housing construction, chamber-drying dry timber is increasingly used, the properties of which make it possible to start interior or exterior decoration immediately after assembling the house kit.

The cost of building a turnkey house is calculated individually.

For the manufacture of house kits from a bar, environmentally friendly wood from the Kostroma region is used.

PHOTO REPORTS

Stages of building a house from a bar

Foundation installation

The foundation for the house should be chosen based on the characteristics of the building site and the size of the log house. In the construction of houses from a bar, various types of foundations are used. The choice of the type of foundation may depend not only on financial costs, but also on the individual characteristics of the area. In some cases, it is necessary to conduct engineering and geological surveys, during which the properties of the soil are studied and the place for construction is determined. Timely geology of the site also allows you to avoid mistakes at the initial stage in the design and select the appropriate type of base for the structure.

Assembling a log house

The assembly of a log house from a bar (profiled bar) can be done at any time of the year. For the construction of a house, a bar of 150 x 150 mm or a profiled bar of 145 x 145 mm are often used. If necessary, our company can build a house from a larger bar. Jute linen is used as a mezhventsovy heater in the construction of log houses. Our company also offers you to order a log house made of dry kiln-dried timber, which is now increasingly used in private suburban construction.

Roofing

Currently, in the construction of houses from a bar, a variety of roofing materials are used. The most popular are metal tiles, ondulin and soft tiles. The basic equipment for building a house includes a temporary roofing material. At the request of the customer, the company's specialists can carry out installation work using the most modern roofing materials, immediately after assembling the log house. The cost and timing of work depends on the complexity of the design.

Shrinkage of the log house

A log house made of ordinary or profiled timber of natural moisture must settle and shrink before finishing work begins. In the process of shrinkage of a log house, wood shrinks naturally. In addition, a slight decrease in the linear dimensions of structural elements may occur. A technological break after the assembly of a log house before finishing can be up to 6 months. Modern technologies of wood processing make it possible to make a house kit from a chamber-drying bar.

Turnkey house finishing

The final stage of construction is the final finishing of the house on a turnkey basis. The cost of finishing work directly depends on the materials used. During the internal and external finishing of the log house, the walls are sanded and painted. The finishing work process also includes: insulation of ceilings, floors; production of casing of door and window openings, their installation and cashing. Specialists of the company "Lesoresurs" at an affordable price will make high-quality installation of windows and doors, installation of a drainage system and hemming of roof overhangs, as well as treatment facilities.

POPULAR PROJECTS

Pay attention to our complete set at home. Our plus is that we have improved equipment, unlike other companies that save on quality. Our insulation goes to all houses and baths in 100 mm, but not in others in 50 mm. Floor logs of the 1st floor are 150 × 100 mm timber, while other companies have a 150 × 40 mm board. We have sets of handles on the doors for both bath and paneled doors, while other companies simply save on such trifles. We value our reputation and try to be as affordable as possible in terms of quality and prices so that our customers are satisfied with their choice. In this situation, the contractor saves his money in his favor, and the customer loses the quality of his house or bath. This is not a lot of information we have shared with you, and the choice is only yours. Best regards, company management.

Complete set of a 1.5-storey "turnkey" building:

  1. Foundation: columnar support (4 pcs per cabinet 200 × 200 × 400 mm). Sand for filling is provided by the customer in the amount of 5 m³;
  2. Waterproofing: roofing material;
  3. Base: timber on edge 100 × 150 mm, or 150 × 150 mm, or 150 × 200 mm;
  4. Floor logs: timber 100 × 150 mm through 80 cm;
  5. Walls of the 1st floor (18 crowns): profiled timber of natural moisture 90 × 140 mm or 140 × 140 mm or 140 × 190 mm (block-house or straight (optional)) );
  6. Partitions of the 1st floor: straight profiled timber of natural moisture 90 × 140 mm;
  7. The walls of the second floor are erected on 9 timber crowns. Height 1.2 - 1.3 m;
  8. Floors: double, edged board 22 mm, cranial block 40 × 50 mm. Finishing floor - sheet pile board 27 mm, or 36 mm;
  9. Insulation: isover 100 mm floor, ceiling and attic (2nd floor) (with a vapor barrier film of category B);
  10. Attic partitions: frame, racks, edged board 100 × 40 mm and sheathed on both sides with chamber-drying clapboard of coniferous wood;
  11. Windows: wooden window block with double glazing and fittings;
  12. Doors: paneled with handles (size, quantity according to the project);
  13. Height: 1st floor - 2.40 m, 2nd floor 2.30 m;
  14. Ladder: wooden with handrails and chiseled balusters (single-flight, rotary according to the project);
  15. Ceilings: hemmed with dry clapboard (softwood);
  16. The 2nd floor is insulated with a vapor-insulating film and sheathed with dry clapboard of coniferous wood;
  17. Interfloor overlap: not planed timber 150 × 100 mm with a step of 1 meter;
  18. Rafter system: edged board 40 × 150 mm, lathing edged board 100 × 20 mm, with a pitch of 25-30 cm;
  19. Pediments: sheathed with chamber drying clapboard (coniferous wood);
  20. The height of the ridge from the log house is from 3.2 - 3.5 m;
  21. Roofing: ondulin (color at choice) green, red and brown (with laying with a vapor-hydro-insulating film of category A or C);
  22. Cutting corners: "half-tree";
  23. Assembly of a log house: iron nails 200 mm, with drowning 2-3 cm;
  24. Casing bars (swarms) are sawn in to fix door and window openings during shrinkage;
  25. Corners and joints are sealed with a plinth of coniferous parod (chamber drying) doors and windows are finished with a casing;
  26. Terrace: if provided by the project, railings with carved balusters and height compensators are installed on the support pillars made of timber;
  27. Nails for fastening parts - black construction;
  28. Nails for fixing the lining, plinth, platband - construction galvanized;
  29. Assembly at the customer's site;
  30. Delivery of materials within a radius of 400 km from the production of Pestovo is free. If the delivery of materials is not feasible with one vehicle with a trailer, then the mileage of the second vehicle is paid separately from the production base to the customer's site.

Additional services:

  1. Replacing a floorboard from 27mm to 36mm - 300 rubles / m²
  2. Replacing ondulin with metal tiles - 400 rubles / m²
  3. Processing the strapping - 350 rubles / m², painting the walls - 400 rubles / m² (artist's material)
  4. Entrance insulated metal door (made in Russia) - 12,000 rubles.
  5. Assembly in a "warm corner" - 7,000 rubles.
  6. Replacement of wooden windows with PVC 1 × 1.2 m - 4,000 rubles, 1.2 × 1.5 m - 5,000 rubles, 0.6 × 0.6 m - 3,000 rubles / piece, 0.8 × 0.8 m - 3,500 rubles, window sill - 750 rubles. standard.
  7. Additional insulation with mines with cotton wool of 50 mm - 170 rubles / m²
  8. Thermal insulation with ROCKWOOL plates in 100 mm - 400 rubles / m², in 150 mm - 600 rubles / m², in 200 mm - 800 rubles / m²
  9. Hemming of gables with a block house 28 mm - 700 rubles / m²
  10. Hemming of gables with imitation of 16-18 mm timber - 250 rubles / m²
  11. Additional partition made of timber - 3,000 rubles / m², frame - 2,500 rubles / m²
  12. Additional strapping from a bar 150 × 100 mm - 300 rubles / rm, 150 x 150 mm - 400 rubles / rm, 150 × 200 mm - 500 rubles / rm
  13. Installation of snow guards - 4,000 rubles.
  14. Installation of roof drainage system - 1,250 rubles / pm
  15. The pile-screw foundation is calculated individually for each project. Welding of piles with a professional pipe 20 × 50 mm - 600 rubles / pm, channel 4 mm - 1,200 rubles / pm
  16. Plinth striping with profiled sheet - 800 rubles / pm, false pvc panels - 1,500 rubles / pm
  17. Country toilet 1.0 × 1.2 m - 10,000 rubles.
  18. Assembling the crowns of a log house on wooden dowels - 70 rubles / rm.
  19. Construction shed - 17,000 rubles
  20. Rent of a gas generator for the construction period - 10,000 rubles, the customer provides fuel at the rate of 10-15 liters of AI-92 per day
  21. Delivery of materials by vehicle over 400 km is paid additionally at the rate of 80 rubles / km

Dear clients of our company!

We also provide services on household issues in the construction industry, EXAMPLE - for the accommodation of our builders at the time of construction, you can purchase a change house 2 × 3 m in size from us, the price is 17,000 rubles, after which it remains with you as a household block. There is also a generator rental, if there is no electricity on your site, the rental price for the construction period is 10,000 rubles + the customer's gasoline. Delivery of materials is carried out

Greetings to everyone reading this topic. I will try to briefly, without wasting words, state the essence of the questions. I was puzzled by the construction of a house. Internal dimensions 9.6 x 7.6 m. The foundation is tape, with a sole. Basement - 4 rows of bricks. The walls are aerated concrete, the floors are wooden beams. Attic. Ladder to the attic, respectively, made of wood. Lately I've been thinking about a terrace on the side of the yard.
1. Region: Southwest Bashkiria.
2. Wall material: foam (gas) concrete 300mm + ventilation. facade, roof - metal.
3. Plot 15 Hundred. (30x50m). The soil is loamy. The slope is south (3%). From the east side, three km. there are mountains. The house is one and a half floors. The height of the 1st floor is 2.8 m. The attic is from 1.45 to 2.45 m. The location is indicated in the image No. 1.
4. Accommodation is permanent.
5. Boiler room in the house. The type of boiler was not specifically defined.
6. House for 1-2 people.
7. The boiler room (aka the boiler room) will be a kind of technical room in which the wiring of communications does not need to be hidden / refined. There will be a supply of water, gas, electricity and a sewer drain. It should be located in the far right corner (see image # 2). The entrance is required from the yard.
8. Boiler room in the volume of 16.2 cubic meters.
9. Summary on some issues:
- a separate vestibule has been implemented to reduce heat loss.

The kitchen and living room should be 2 separate rooms. I admit an opening-window with a folding (?) Table top in the adjacent wall. A kind of mini bar counter.

The sleeping area is located on the second floor.

No need for an isolated messy hallway area.

There should be a SU on the second floor. Bathroom / shower cubicle is located on the ground floor.

The entrance to the SU is not important. In general, I assume a combined SU, divided by a light partition.

The working area of ​​the kitchen should be located along the outer wall. Image # 3 shows the sewage system in green.

1. The staircase looks uncomfortable. Steps for the ceiling 1 floor. 3 meters is not enough. Yes, it takes up space, but, in general, the large hall on the first floor is not very functional. I would sacrifice it in favor of a normal staircase. A ladder is both safety and convenience. If you are building for yourself - think, you will also hobble along this ladder in retirement. Don't skimp.
2. You can make the entrance to the boiler room from the vestibule. This will allow (if necessary) to slightly move the vestibule to the left (so that a normal staircase climbs in) and the hall will become more functional (in this corner you can make some kind of cabinet).
3. Incomprehensible with an internal load-bearing wall. In theory, this should be a wall between the bathroom-hall and the kitchen-living room. It should be thicker than the rest of the partitions. Now the wall between the kitchen-living room is thicker.

The choice of the number of storeys in the house is a rather difficult and responsible question, which should be taken seriously. The one-and-a-half and two-story houses have their own individual characteristics, which must be taken into account during construction. Therefore, it is important to familiarize yourself with them in advance.

The main differences between the attic floor and the second

There are differences between the two types of buildings that make them so different.

  • First of all, it is worth noting the cost. The construction of a one-and-a-half-story building will be relatively lower than that of a full-fledged second floor. The price will also be influenced by the shape of the roof and the type of roofing material.
  • In terms of execution time, the attic floor can be built much faster than the second floor and the roof.
  • The load on the foundation for the first option is lower, which saves on the construction of the foundation.
  • In the attic floor, rooms are obtained with a smaller usable area, since the height of the walls does not exceed 1.5 meters.
  • In the attic it is possible to make skylights, due to which there will be much more light in the room.

These differences determine the choice of development. Each option has its pros and cons, the decision remains with the owner of the future building.

Features of a two-story house

The two-story building involves the arrangement of a full-fledged floor and an attic space. With such a construction, it is worth considering the load of the walls and roof on the foundation. The base must be strong and solid enough. The height of the ceilings over the entire area of ​​the room is the same and allows you to distribute furniture as desired. The attic space can, in turn, be used for any economic purposes.

Pros:

  1. more usable area;
  2. the attic can be arranged to store seasonal items.

Minuses:

  1. requires the arrangement of a more powerful foundation;
  2. higher cost.

The second floor is considered complete if the height of the wall exceeds 1.5 meters. This is the main characteristic that distinguishes the attic floor from the second.


Distinctive characteristics of a one-and-a-half-story house

Today, such buildings are very popular due to the fact that they are quite economical in terms of construction costs. At the same time, people are fully provided with living space. According to the norms, a semi-attic floor is considered if the height of the walls does not exceed 80 centimeters. A full-fledged attic, according to the norms, should have walls with a height of 80 centimeters to 1.5 meters. The roof acts as a ceiling in such a room, but there is no attic room.

Such living quarters are most often used for arranging bedrooms and children's rooms. It looks very impressive when the windows are located not on the walls, but directly on the roof. Angled windows let in much more sunlight. To minimize noise from rain and other precipitation during the construction of the roof, it is very important to pay special attention to sound insulation; for this purpose, it is necessary to use special insulating materials and cladding with general construction sheet (with subsequent finishing) or immediately decorative materials.

When arranging furniture, some difficulties may arise, since the outer walls will be much lower than that of the full floor. This problem can be solved by making custom-made furniture.

The advantages of a one-and-a-half-story house can also be attributed to a relatively low weight, since the walls are much lower, and there is no overlap between the second floor and the attic. This reduces the stress on the foundation of the house.

Which house to choose

The choice will depend primarily on the personal preferences of the developer (owner). The main thing is to first familiarize yourself with all the characteristics of the two buildings in our catalog of country houses. Both options are great for residential construction. And they can fully satisfy all the needs of every inhabitant of the house. Also, the choice can be influenced by the financial aspects and the ability to carry out turnkey construction or perform all the work on our own.