All you need to know about installing the veranda. The veranda is attached to the house - design projects and design of the modern terrace (60 photos) of the completion of the veranda

1. Whether permission is needed to reconstruct the veranda and an open terrace in a rustic house.

1.1. Dear guest G. Krasnoyarsk!
For the reconstruction of households in a residential building, a written permission is required in the administration of the municipality (Article 51 gr to the Russian Federation).

Good luck to you Vladimir Nikolaevich
Ufa 24.07.2018

2. Husband entered into the house inheritance through the court. In the court decision, the area of \u200b\u200b95 sq.m. Now BTI does not make the plan since we removed the veranda that is, the area has changed. And they started reconstruction. How to make all reconstruction and then go to court?

2.1. Yes, you can do this. Perform reconstruction and legitimize it through the court. And you can take permission to reconstruct immediately, if not too late.

3. In 1989, part of the house with a cold veranda was purchased. Somewhere in the early 90s, she was laid by brick and the meter was extended, and at the end of the 90s they made a residential premises from it. Will it be considered samostroy or reconstruction? And what documents are needed for submission to court?

3.1. It will be a reconstruction, to confirm the legality of which and the compliance with its construction and other standards will require a construction and technical expertise, as well as the consent of the neighbors and ownership of the land plot.

3.2. You have illegal reconstruction.
The list of documents attached to the lawsuage is established by Art. 132 Code of Civil Procedure:
The statement of claim is attached:

Its copies in accordance with the number of respondents and third parties;
a document confirming the payment of state duty;
power of attorney or other document certifying the powers of the representative of the plaintiff;

documents confirming the circumstances on which the plaintiff basses its requirements, copies of these documents for the defendants and third parties, if they are missing copies;

The proof confirming the fulfillment of the mandatory pre-trial procedure for the settlement of the dispute, if such an order is provided for by federal law or contract;

The calculation of the recoverable or disputed monetary amount signed by the plaintiff, his representative, with copies in accordance with the number of respondents and third parties.

Simply put, you need to attach documents confirming the circumstances to which you will refer to the claim.

3.3. Good day! This is a reconstruction, but unauthorized. Perhaps you do not need a court. We need to watch documents, if there are those. Passport of the BTI 90s or 00s, then you can make changes on the basis of them.
In any case, you are not in a hurry with the court, try to maximally collect documents, it is also important that you have a lease or property to land.
You can show the available documents, we will tell you where to turn.

Good luck!

4. I want to know. We live in a private house, can we insulate the veranda in order to increase the living area. Will it be considered a reconstruction of housing? Do I need to take permission? And is it possible to do this at the expense of mat. Capital?

4.1. This is a reconstruction, because falls under paragraph 14 of Art. 1 GRK RF reconstruction of capital construction facilities (with the exception of linear objects) - a change in the parameters of the capital construction object, its parts (height, the number of floors, area, volume), including the superstructure, restructuring, expansion of the object of capital construction, as well as replacement and ( or) restoration of the supporting construction structures of the object of capital construction, with the exception of the replacement of individual elements of such structures to similar or other improvements of such structures elements and (or) recovery of these elements
and art. 25 LCD RF Reconstruction of the premises in an apartment building is a setting, replacement or transfer of engineering networks, sanitary and technical, electrical or other equipment, requiring changes to the technical passport of the room in an apartment building.
In order to produce reconstruction, it is necessary to come to the Department of Construction, GosExpertiz and Housing and Communal Services of the Kurgan Region with documents, to submit notice to reconstruction.
Within 7 days the answer will be given.
If the answer is positive, then you can reconstruct using maternal funds.

5. In the two-year-old log house there is a veranda cold, in her place we want to build a boiler room in the same sizes. It will be a reconstruction or redevelopment. Nowhere found that in the apartment you can make a reconstruction. Earth owned and apartment too.

5.1. The concept of reconstruction refers to a specific building, redevelopment - to specific rooms inside the building ... In your case - reconstruction ... The boiler room is coordinated with the administration and neighbors ...

6. Land owned by property. Started reconstruction of the house. The veranda is extended to the meter, the old roof is dismantled, the frame of the new roof is partially made. Before the fence of more than three meters. Notification for reconstruction was not filed. Old house, respectively, remained in the former borders, except the veranda. In court, reconstruction will be recognized.

6.1. Good day! Why don't you contact BTI or cadastral engineer to make a technical plan? And with these documents in Rosreestre update information?

7. There is a floor of the house owned. The house has a veranda and hozblock is used as a chunnel. I want to carry a veranda and hozblock and in their place to attach a living room and a bathroom. Can I do this without notice of reconstruction. Without changing the building stains.

7.1. Without notification of the construction-reconstruction of the house, as well as the permission of the second owner, can not, since you have a joint-shared property of Art. 247 of the Civil Code of the Russian Federation.

8. My grandfather has a brick private residential building, the veranda is originally attached to it (also a brick-difference only in masonry thickness). Now wants to make residential heated rooms and a second corridor from the veranda and Seine. What is necessary in order to legitimize the "reconstruction" (work on insulation has already begun)? Where and for how to contact? What documents to provide for registration of alterations?

8.1. Contact your local administration. You need to submit a notice of the planned reconstruction of a residential building. When obtaining the consent of the administration, carry out reconstruction. After finishing it, you need to conclude an agreement for the fulfillment of cadastral works with the cadastral engineer. It will make a technical plan for a reconstructed residential building. Again to the administration, it is necessary to submit a notice of completed reconstruction of the house. After receiving the consent, all documents are sent to the IFC with a statement of amending the object of capital construction.

If you find it difficult to formulate a question - call a toll-free multichannel phone 8 800 505-91-11 , lawyer will help you

The department works on the territory of the exhibition complex "Terem" in Kuzminakh. We offer a wide range of services for the extension of new premises, the completion and reconstruction of existing buildings. We work individually with each client individually, we develop a project based on the wishes of the customer and the volume of upcoming work.

If you have long wanted to update your home, repair it or increase the area, contact the DEEME and Reconstruction Department of the company "Terem".

The appearance of the house is important as well as the fortress of its walls, and the reliability of the roof. Modern buildings are distinguished by high-quality and aesthetic finish of facades, which you can order in the department "Forterance and Reconstruction". We offer our customers various types of finishing materials from leading manufacturers, as well as professional work performed in the shortest possible time.

To update the appearance of your home, you can choose:

    fibro-cement panels Nichiha (Japan);

    thermopanel with clinker tiles Stroeher (Germany) and Ceramika Paradyz (Poland);

    facade panels Vinyplus and Vinytherm (Germany);

    facade panels Nailite (USA);

    fineber facade panels (Russia);

    vinyl siding VOX (Poland);

    vinyl siding Mitten (Canada);

    vinyl siding Encore (USA);

    vinyl Siding Döcke (Germany - Russia);

    vinyl Siding Fineber (Russia);

    falchbrus with painting in the factory conditions paint "Tikkurila" (colors in assortment);

    block House, Falchbrus, Lining.

Quickly and qualitatively replace the root or make a new one to the unfinished house will help the brigades of the department "Final and reconstruction". We offer you various options for roofing materials, among which you will definitely find the appropriate:

    cERTAIN Teed bitumen tile (USA);

    shinglas bitumen tile (Russia);

    natural tile BRAAS (Russia);

    metal tile "Cascade" (Russia);

    metal tile "Monterrey" (Russia);

    professional flooring painted (Russia);

    professional flooring galvanized (Russia).

If you have an old house, requiring reconstruction, unfinished log house or you just want to update your cottage to the summer season, please contact the department "Hope and Reconstruction". We offer you a whole list of reconstruction services that will help make your country life more comfortable.

Our specialists are ready to fulfill:

    work on replacing or installing the trim;

    work on replacing or installing outdoor decoration;

    work on the replacement or installation of the roof;

    work on replacing or installing drainage systems;

    work on replacing or installing windows, doors and inter-storey stairs;

    installation work on the installation of roller shutters;

    work on the interior of the floor, walls, ceiling;

    works on insulation and soundproofing of buildings (Knauf, Rockwool, Isover);

    work on replacing and strengthening structural elements;

    painting work;

    dismantling work.

It is more pleasant to make life in a country house, just attached a comfortable porch, veranda or terrace. You can even attach a winter garden, a barbecue area or a full-fledged living room. Contact the department of "Final and Reconstruction" and find out how else it is possible to increase the area of \u200b\u200bthe structure.

Now there are special prices on the extension of the veranda and terraces.

One of the most sought-after services of the department "Final and Reconstruction" is a superstructure of the attic. Thus, you can increase the area of \u200b\u200bthe house and get one or more additional rooms. In the attic rooms often equip bedrooms for children, cabinets or guest bedrooms.

Now you can suck a turnkey attic at a special price.

The department "Final and reconstruction" launches a unique share specifically for owners of houses from the company "Terem"!

Update your country residence at a special price! Large discounts on the decoration of houses and baths from "Terem" siding, insulation of buildings and, most importantly, the construction of various attacks act only a week!

Moreover, if you order these services during the action period, on May 29 inclusive, as a gift, our specialists will adjust the windows and drainage system in your house. As a result, you will actually spend at home and extend the time of his service.

In confirmation of the quality of work, we will increase the warranty on the updated structure for three years. Thus, the warranty on the frame houses will reach 18 years, and on the bar - 28!

Read more with the terms of the action Meet or learn from the managers of the "Final and Reconstruction" of the company "Terem". We are waiting for you at the exhibition complex at the address: Moscow, ul. Zelenodolskaya, Vl. 42, from 10:00 to 20:00

The Terem company works not only with existing buildings, but also designs new ones. If you want to get a small structure according to an individual project, contact the department's specialists.

Dismantling of wooden buildings

Independent dismantling of wooden buildings can turn into a collapse, so do not risk and try to fulfill this work on their own. The specialists of the company "Terem" during dismantling necessarily comply with the safety regulations and clearly follow the technologies for the analysis of wooden objects.

    Dismantling extension

    Dismantling of mansardes

    Dismantling partition

    Dismantling roofing

    Removing the sheat (inner or outer)

We draw your attention, disassembly is carried out without destruction of garbage.

Any object is sacrificed to the base. If the construction is further planned, then after the destruction of garbage will remain a clean plot, where construction work can be started.

Foundation for an extension

If you decide to make an extension to your home, then the first with what you will come across - the need to choose the foundation. The company "Terem" offers the opportunity to order one of the following types of foundations:

You can order dismantling of the following buildings:

    Sawno-screw

    Plocks from blocks

    Monolithic reinforced tape

    Bromarotic with Ruralkom.

Our specialists will help you with a choice, consult and answer all the questions you are interested in.

Individual reconstruction of buildings

    Window replacement

    The device for the dismantling of old windows and the installation of new, selection of the type and type of windows at the request of the client. Wooden - inexpensive, environmentally friendly windows requiring some care. It is possible to install a wooden glass package. Plastic windows - durable, durable, easy to care. An important point is the installation that professionals should be engaged with extensive experience.

    Replacing doors

    Replacing interroom and entrance doors. The popular option is varnish violent with good sound insulation, high degree of strength and reliability. When choosing an entrance door with a reliable and solid version there will be metal doors that will protect your home will serve for many years and surprise with their resistance to temperature differences, corrosion and fire. Also, our specialists will also be brought and installed input and interior doors of your individual order.

    Replacing the stairs

    The service for replacing the wooden staircase. The execution of the service begins with dismantling the old staircase. The new staircase is brought to a plot in a disassembled form, all parts are steps, railing, balasins are numbered. After assembling the stairs begins the mounting stage. The staircase is installed and securely fixed.

    Replacing the roof

    Service for the replacement of the roof and / or roofing with the ventilation device of the underground space. Reconstruction of the whole roof, full or partial coating replacement, competent selection of roofing material leading manufacturers. Construction of mansard floors with the possibility of choosing the type of roof: scope (single-sided, duct, etc.), flat, broken.

    Replacement and strengthening of the structural part of the house

    Device of new partitions, redevelopment of the room, as well as the arches device, installation of beams. Experienced specialists will fulfill all work on replacing and strengthening the structure of the house as soon as possible and using high-quality building materials.

    Installation of the drain system

    Additional insulation of the country house is carried out in order to preserve heat in the house. Walls can be inspired from the outside and inside the structure. Most often used mineral wool of the famous brand Knauf, in plates or rolls.

    A professional team and specialist for consulting and promptly solving issues have been allocated to work on each project.

Completion of existing buildings

    An extension of the terrace, veranda or combined extension by an individual project

    The extension of the terraces and the veranda in typical or individual projects, taking into account the characteristics of the main structure. This option of modernization of the house is the optimal solution to increase the area of \u200b\u200bthe structure and will help to give the house uniqueness, architectural completion. In the development of the project, our specialists take into account the type and depth of the foundation, the condition of the walls and roofs. Decorative finish is made in accordance with the appearance of the main building.

    Construction of a full-fledged second floor

    A full-fledged second floor is a room, the area of \u200b\u200bwhich is equal to the area of \u200b\u200bthe first floor, and the ceiling is made without bells. Specialists of the company will carry out the construction of the second floor, taking into account all the rules and rules and using modern materials.

    Construction of a mansard floor

    The attic floor has a number of undeniable advantages. First of all, this is an additional useful area, which can be equipped, for example, under the bedroom, a nursery or a rest room. The height of the monsard walls before the start of the skate is not more than 1.5 meters.

    Damage floor can be several configurations:

    • With a double roof

      With broken roof

      One-hour floor

    Erectation of plating an archery

    The service allows you to increase the area of \u200b\u200bthe main building. Additional space most often attached to kitchens, table, living room and even bedrooms. Modern materials and technologies are used

    Interior decoration

    You can order an internal structure of the structure using the following materials: Lining, Falchbrus, Blockchakos, Plasterboard, OSP, Plastic Panels, Floor Board, Laminate.

    Exterior finish

    The service is performed using (client selection) of the following modern materials: siding, lining, facade panels, clinker tiles, base siding, decorative elements.

    Outdoor painting

    Processing and protection of outer walls from external environmental impact.

    Wooden trim BAT.

    The finishing finish of all rooms, including the pair.

4 steps to successful construction

    Step I. Filling on the online application and pre-call

    Step II. Visit to the exhibition platform. At first meeting with employees of the department, it is advisable to bring information about your structure: photos, plan (by hand or BTI). Specialist will determine the possibility of carrying out works, deadlines and preliminary cost

    Step III. Departure engineer-measurer following the first meeting for a detailed inspection and measurement of the object

    Step IV. Making a technical assignment, design and calculation, conclusion of the contract

this section we collected for you the real stories of our customers. Photos will help you clearly imagine how the house looked like to contact the company "Terem" and what they have become after completion and / or reconstruction. And in the description you will find information about the finishing materials used and the steps of the work. The section will be regularly replenished with interesting stories and illustrations.

From a small house in the mansion

The department of completion and reconstruction of the company "Terem" is engaged even in the most complex and large-scale cases. This time, experts had to work on a house of a log with two extensions from the bar of the Golikov family. The house was entirely covered with siding, so the outer decoration was not required. But it was necessary to dismantle the roof with overlapping on two extensions and roofing at home.

After the end of the preparatory work, qualified builders took up the buildings of the walls of the attacks to the level of floor overlaps and the second floor add-in over the existing extensions. But there was still insulation of the elements of the whole structure: overlaps, walls, roofs. The final stroke was the replacement of the roof of the house and the porch, as well as the interior decoration and the installation of the drain system. As experts from the department of completion and reconstruction explain, the work was really large-scale, but now the service life of the house has increased at times.

During the work, only high-quality building materials were used: Cascade metal tile, Siding encore, Nicoll drainage system, KNAUF thermal insulation material.

when professionals work on the project

The team team of the completion and reconstruction of the company "Terem" was to do a huge work - an old house from a bar to turn into a modern, warm and beautiful cottage.

The work began with dismantling the veranda and terrace. After that, the device of a ribbon monolithic foundation began, on which the insulated frame veranda was then elevated and the terrace was erected. He was replaced by all windows, doors, a staircase and drainage system was replaced. Professional builders also made an outdoor finish of the whole house. In the department of completion and reconstruction, they explained that for work, high-quality and proven materials were used: Metal tile "Monterrey", the thermal insulation material Knauf, and the outer decoration was made using the blockhaus.

The company "Terem" deals with completion and reconstruction without exaggerating all types of country houses. To each object we can find our approach, including brick houses. This time, the company's specialists took over the completion and reconstruction of the Ivanhenko family house.

Dismantling roofing the veranda and the strengthening of its walls was carried out. Professional builders increased the height of the existing foundation under the extension of the columns from blocks. After that, an extension of the frame veranda with an open terrace and the installation of a staircase and fence was carried out. In the department of completion and reconstruction of the company "Terem", explained that outside the veranda was trimmed by a blockhaus, also in the shortest possible time internal wall decoration and installation of windows, and the roof of the builders Put the galvanized professional flooring.



In front of the experts of the department of completion and reconstruction, the task of building a new attic floor and replaced the roof of the garage. It was to work with a brick house of modern building.

Works began with dismantling attic to the slab overlap. After that, the builders were engaged in the construction of the Knauf of the attic floor insulated with thermal insulation material and the replacement of the roof of the garage on the soft roof of the ST-20 Cedar Brown.

For the interior decoration of the entire place of the attic was used by the blockochus. We also installed the attic windows and crossed the front panels with front panels, "said the builders at the customer's house, builders installed snow-sheds and the Nicoll drainage system.

The Novikov family turned to the company "Terem" in the hope of giving a new life to his home with a veranda from the log. The department of completion and reconstruction took up the work.

We had a lot of work. It was necessary to make a dismantling of the old roofing coating, then replace it with a new one. We also needed to install new windows, doors, a staircase, a drainage system, "says the technologist of the completion and reconstruction department.

With the customer's tasks, the builders and specialists of the department coped to the "Hurray" and fulfilled all this in the shortest possible time.

But the most large-scale part of the entire reconstruction was an extension of a warmed veranda with a one-hour floor and an outdoor terrace. Before starting work, professional builders were installed in the installation of a tape, monolithic-reinforced foundation for an extension.

An important point is the materials we used during the work. The company "Terem" enjoys the services of only proven suppliers and uses exclusively high-quality materials, they explained in the department of completion and reconstruction.

Therefore, the ENCORE siding was used for the outer decoration, the roof material was the cascade metal, the products of Knauf were used as thermal insulation material, and the Tekhnonikol cargo system.

The family of Novikov was satisfied, and in the Department of completion and reconstruction of the company "Terem" they say that this is how you can give a new life even the oldest building. The main thing is to contact the proven company.

Specialists of the Department of completion and reconstruction of the company "Terem" took

The veranda in a private house is the covered terrace, which is often attached to the house with their own hands. It is located along the main wall and is a room without heating, for a pleasant pastime in the summer season. You can often find modern terraces with glazing, you can be in any weather. By doing her own hands, it is necessary to observe the overall ensemble of a country or country house, to observe a single style and apply the same materials in construction.

In the country house from the logs it is better to make summer ferryLocated next to the main structure. The construction of the veranda in wooden logs is often performed in conjunction with the construction of the main house and its roof smoothly move into the roof of the extension, which has an adjacent wall with the house, the single material for the roof is applied. In this article, we will pass step by step the main points of construction of the terrace of two types: an open or closed look, do it yourself.

General provisions for building a veranda

Modern construction of country houses, cottages, in the design stage, provide for the construction of a veranda for the house. In order to save money, the construction process of the attachment, customers take off, for further completion of it with their own hands. Consider the highlights to which it is necessary to pay attention from the generalized experience of the construction of the terraces independently.

Parameters for which veranda differ:

  1. As it is located in relation to the house: Corner construction, from the end or along the facade of the house.
  2. Degree of security: open or closed (glazed) extension. You can apply modern materials from the closed veranda open, it is achieved by sliding doors.
  3. In which design it is made: the built-in is a common foundation or a bounted foundation.
  4. Construction form: Rectangle, semicircle, polygon.

Project veranda

We must not forget, making the project an extension in the house that its purpose is to improve the indicators of the main structure: make it spacious, add beauty, comfort. The closed view terrace also carries the function of improving thermal performance at home. For the proper construction of the structure of the summer extension, the rules that are specified in the developed project must be followed.

What is the project from:

  • We define, in which location of the main house we will add a veranda. The main aspect is observing the aesthetic perception of the entire architecture of his own home together with the veranda. Important! Experts recommend to equip the veranda in regions with high summer temperatures on the western or east side of the main house. It will be less in direct sunlight.
  • You must specify the place of entry on the terrace (veranda). Specifies the entrance from the outside and input from the house. You can make a pass-through pass through the veranda when the door to the house is located opposite the entrance to the veranda, this method is not welcome, since there is a risk of drafts.
  • Select the type of doors and locations of their installation.
  • We are determined with the overall size of the summer room located along the house. Length is often taken equal to the length of the wall, along which the veranda is built. The width is usually accepted from 3 meters to 7 meters, the main thing is to comply with the proportion. Choosing the sizes of the veranda, correlate them to the general size of the house, to comply with the unified ensemble of the exterior of the structure.

A good example of building a veranda with their own hands when the project is done still at the design stage of the whole house.

We will pass step by step construction of the veranda in a wooden house with their own hands. It should be noted that the extension to the house can be started only after its full shrinkage. Log houses, or made of timber, are attacked actively for three years, during this period it is better not to build an extension, and it is possible to skew walls. Experienced builders are recommended for those who do not want to wait to build a veranda construct with a house that allows the frame to play.

How to start construction?

Perestroika at home Must be reflected in permits. To obtain these permits, you need to contact regional architecture management and submit documents:

  1. For the right to own land, the land on which the house is worth).
  2. Project documentation of the main structure.
  3. The written consent of all in the house of prescribed tenants for reconstruction, the extension of the veranda.
  4. Declaration of developer on the design of an extension.

It is advisable to start making documents for building resolution 3-4 months before the start of work. From the generalized experience of private developers, this is a long procedure.

You can maintain the construction of an extension without permits, but in this case there may be problems when the house goes into the inheritance or you wish to sell it. The reason is to change the total area of \u200b\u200bthe house, since the veranda is part of it, and the total area of \u200b\u200ba residential building is considered to be. The BTI department can consider this as a unauthorized solution to enlarge the area for housing. This is especially regarded when the terrace of a closed type with heating.

Do not get carried away and make deviations in the sizes of the terrace, which are listed in the project. A simple check is easy to find out and follows a fine with the adjustment of the documentation. To expect unauthorized developers of accession to the house veranda indicated in the Law of the Russian Federation.

Preparing for construction, choose the material

After determining the construction site, the veranda must be prepared. A construction site begins along the selected wall, so before all the work it is necessary:

What tool and the material will we need?

When the wooden extension is done with their own hands, you will need a tool:

  • Having construction skills need: hacksaw, ax.
  • Power instrument: sledgehammer, hammer.
  • Marking: Roulette, plumb, level, marking cord, corner.
  • For foundation: shovel

If a metal frame is made, the welding unit and a booster with a disk for cutting metal is additionally prepared. The frame of this type is considered to be the most economical for the construction of an extension.

It will be better to look brick veranda or wooden. Important! Observe the compliance of the tuning materials and the main house.

Wooden summer extension requires the following material:

  • Lumber: timber, log, board, rake.
  • Elements of wooden fasteners.
  • Mixes performing protective functions for wood.
  • Building material: crushed stone, concrete.
  • It will takes a olive and ruberoid.
  • We choose the material for the roof of the veranda.
  • Window and door systems.

In the design of the extra room, for summer holidays, using metal corners, instead of wooden materials apply a metal profile, Metal processing formulations.

It is possible to make an extension (walls and roofs) from polycarbonate for a better review, the panorama will be complete and overview. The positive properties of this material applies, and the ability to keep warm perfectly, it is allowed to apply for walls and roofs.

Tip! Materials that will be applied in construction and needing pre-processing must pass this process before construction.

The first thing to be done is to determine the type of foundation for your veranda. A popular view is foundation columnalSince it is not attached to the foundation of capital construction (at home). If the veranda is shut-off for a long time and capital, it needs a tape foundation.

Before making the foundation, it is necessary to refer to the construction documents of the house, where it is indicated, on which soil it costs, you can choose from this type of foundation for an extension. The parameters for which you need to pay attention to:

  1. What is the ability of the soil in the absorption of moisture.
  2. What is the composition of the soil at the construction site of the veranda.
  3. What depth the ground is freezing in the residence region.
  4. How close to the surface are groundwater.
  5. General soil stability provisions.

Choosing the form of the foundation under the veranda, we draw attention to the foundation of the main building, its design, in what condition the bearing walls. After selecting the foundation, done marking on the ground for further work.

Tip! A small wooden veranda will be quite good to stand on a column foundation at the angle of extension. For wide veranda and long, the installation of pillars after 600 millimeters along the length and width of the extension is used.

Column foundation, how to make it?

The base (foundation) for an extension is as important as for the main house, it is necessary to make it from a quality material. Procedure for performing work:

  1. Pop the holes for pillars to a depth of at least 100 centimeters, its depth cannot be less than the depth of the foundation under the main structure. The level of soil freezing, the fossa must be deeper than this level.
  2. At the bottom of the dug holes, we make a pillow, this is a mixture of sand and rubble. The pillow can be made by layers, sand, crushed stone.
  3. Pour the pillow with concrete.
  4. From the brick lay out the support columns when the main house is brick. If the main house is wooden as columns, a wooden timber is used. Metal supports or asbestos pipes are used in bar basements for the frame veranda.

Beautifully looks a veranda when she is at 2 floors at home. In this case, by the level of the main foundation, the ground part of the extension support is displayed under the house. When a house with a high basement is recommended a veranda to output in its level.

Making a ribbon foundation

It is used if a heavy veranda is planned with glazing. A trench is reaping around the perimeter of the future veranda, a formwork is installed. It put a little higher than it is planned to pour the foundation concrete.

After the fill of the foundation concrete, it is periodically wetted with water to complete formation, it is necessary for uniform hardening the foundation.

Make a frame of veranda

For a wooden house, the frame of the veranda begins with laying a bar on supports into the bottom strapping. At the corners we use the "Lastochka Tail" for marks, so better shy a bar on the corners. For reliability, nails are used, you can pinch the mount.

A wooden veranda timber is applied by a cross section: 100x100 or 180x80 millimeters. When logs are used in the strapping, the cross section of them should not be more than 120 millimeters. Supports near the wall are made above the rest for the formation of a pitched roof. When the frame is mounted, horizontally installed bars are the base for the windowsillif glazing is envisaged. The upper strapping ends the installation of the skeleton of the veranda, it is the basis for the rafted, creates the stiffness of the entire system.

Temporary struts must be used to avoid skewing in the frame design.

Roofing veranda

After when it was determined with the material for covering the roof, it is started to install the crate on the rafters, which are attached to the upper strapping.

Constructively for the veranda are offered the following types of roof:

  • Single roof. This is a simple design, easily running. Requires a slope from the main wall of the house towards the street.
  • Gable roof. It is used if the veranda is attached from the face at home with a narrow side.
  • Polygonal roof. Its design is diverse, most importantly, abide by the bias.

The rafter system is set on the basis of the selected material:

  • Metal Roofing, Slate and Ondulina
  • Solid flooring is done for flexible roofing materials.

With your own hands, the floor is made simply:

  1. We establish lags on the bottom strapping of the construction of the veranda. The distance between the lags is not more than 100 centimeters. Installation of them we make perpendicular to the floorboard.
  2. We cover the lags tested by a float level.

If planned to build open verandaMany converge on the floor with a small slope for the water stack. The board is attached by self-drawing, the length of which is two widths of the board. It is necessary to impregnate the genital boards with a solution that opposes the creation of fungal deposits.

Conclusion

Some elements of the finish can be made in a wooden veranda carved. The placement of furniture on the terrace plays great importance, it will create the interior and add comfort. Flowers and plants revive the room, give a feeling of continuing a residential building.

The competent erection of attachments of various purposes can not only expand the living part of the house, but also improve its appearance and protect against wear. The construction of the veranda adjacent to the house, regardless of the type of structure, requires careful project development, with the definition of materials and construction technology.

Proper design and approval of project documentation in government instances will not only insure problems with the law, but also will help to make a plan and estimate of the structure.

Design

A typical veranda is a roof-covered frame structure, erected on a tape or column foundation, with glass or half-glass walls. The statement that the veranda should be built from the same materials as the main building, with the emergence of new styles and fashion trends in architecture, has lost its relevance.


In the photo presented below, the prepared solutions of the veranda attached to the house with various principles of combination. In some cases, the new extension is made of the same materials and is fully combined with the house, in other new, combined with the preservation of common elements - roofs, beams, and the like.

There are also projects in which the original design of the extension makes a new architectural notch, updating the exterior.

When choosing materials and construction technologies, the parameters of proper ventilation, moisture resistance and thermal insulation should also be taken into account. With complete glazing, you need to provide opening segments for airing.

In the event that an open veranda is built, or as it is also called - a summer terrace, you need to take care of the frost-resistant facing and the slope of the floor towards the site.

Designs with removable frames are optimal for year-round use. Installing large sliding doors will also make it possible to use the construction in the two-fold version.

In the typical project, the area of \u200b\u200bthe veranda is rectangular and ranges from 10 to 15 sq.m. With smaller areas, it will be too closely, with large - additional strengthening for the roof will be required. Possible polygonal and semicircular in the form of foundations.

In its location, the veranda may be an angular, end or facade. The original solution can be considered the construction of the terrace around the perimeter of the house, which can have glazed, open and closed zones of various purposes: it can accommodate the hallway and recreation area, and a large pantry.


Foundation

The foundation of the terraces and the veranda attached to the house should fit tightly to the main construction, but at the same time have autonomous supports.

Ribbon foundation is suitable for large and heavy structures, in all other cases you can build a column foundation. When pouring concrete you need to leave a gap of 3-4 cm with a capital wall, which will be subsequently filled with waterproofing foam.

At the first stage of preparation for construction, the soil is cleaning and tamping. Then the angular pits at the depth of the foundation of the house (about 1 m on average), the pillow is made from rubble, gravel and sand on which concrete is poured.

After setting, supports from asbestos or metal pipes are inserted. Concrete pillars or bricks can also be used. The same method lay high piles for buildings adjacent to the level of the second floor.

Depending on the area and the weight of the terrace, intermediate pillars mounted every half meter may be needed.

For the foundation of the ribbon type, a trench of 30-50 cm is broken, the formwork placed 15-20 cm above. Metal reinforcement rods or reinforcement grid are inserted into the ground. A concrete is poured on a layer of rubble and sand.

Frame from a tree

The frame is mounted from bars or logs with a width of at least 12 cm, which are covered with a waterproofing layer. For the strength of horizontal mating, experts recommend using fasteners into the paw, the surface of the compound will be at an angle. Vertical racks are fixed with diagonal interceptions.


At the final stage, the wooden frame is covered with rafters for the roof. For cladding, you can use plywood shields, chipboard boards, etc.

The construction of a wooden veranda is the best budget decision on materials prices, but when choosing this type of construction, you need a professional approach and knowledge of the nuances of construction from a wooden bar.

Other Materials for Verand

The design of foam blocks is erected on a tape base. Such a laying is easy to do it yourself. The masonry is carried out using a special glue, with dinch of seams for strength.

During decoration, an internal and external waterproofing layer is provided, trimming by plasterboard, wooden shields, moisture-resistant wallpapers and paints. The outer surface can be fed by ventilated facades.

Construction structure from polycarbonate, modern and attractive option. This material is well combined in buildings with wooden and brick frame.

For the construction, which consists entirely of bicarbonate shields not need the foundation. The land can be simply tamped and covered with sidewalk.


The design is created using aluminum profiles, it is necessary to envisage the possibility of ventilation and water removal. Polycarbonate shields and frames of various types can be selected for specific queries for lighting and thermal insulation.

Before attaching a veranda to the house, you need to decide on the functions that it will perform. In addition to necessary in any case, drainage and ventilation systems, proper adjunctions to the capital structure and the roof design, the schedule of using this part of the house is important.

Design and construction of summer veranda differs from room requirements with year-round operation. It is also important to note that any extension will require the same care and update, as well as capital buildings.

Stock Foto Veranda bounted to home












Paradox: The more cities grow, the greater the number of their inhabitants are dreaming of a cozy own dwelling on the lap of nature. Catering construction flourishes in all regions of Russia. Many families have a long time for a long time there are country areas with buildings raised on them. For various reasons, the owners of such old buildings do not undermine the construction of a new home and continue to live in close rooms and use the dilapidated communications.

There is an expensive new building. There is an alternative - the reconstruction of the country house, inexpensive which is reasonable using experience and skills of specialists. Professionally executed, technically sound work with the use of modern materials are able to completely transform the house.


House that has ceased to respond to the requests of owners

Ways to repair the country house: reconstruction (completion, restructuring, redevelopment) and restoration

Old, but quite suitable and arranging home can be restored. This will be an economical update option with facade facing and insulation walls. Also extend the service life of the building can be broken the roof, strengthening the foundation, rebuilding the floor.

It is resorted to reconstructions when it is impossible to do with simple repair. There is a need to reconstruct the old cottage with an increase in the useful area, finish the construction of the house or combine it with other buildings. Often, the owners seek to complete the country house or redevelop the premises, equip the living attitudes, attach a veranda or terrace.

The cause of transformations can be not only physical, but also moral wear (the composition of the family, tastes and preferences changes). Although during the reconstruction, the foundation is not affected (and this is a significant savings compared with the construction of a new building), such tasks suggest a large amount of work. At this time, the owners will have to find temporary housing.


Useful area does not happen much

In old summer houses, problems are often associated with roofs, floors and overlaps. Roofing (most often slate) cracks, leaks appear, the house becomes cold. The rafter system does not hold the load, the design is deformed. Cleansing and floors begin to rot and collapse.

Since the completion and reconstruction of country houses of any level - the event is costly, both in finance and in time, the prudent owner conducts a complete survey of housing (often with the involvement of knowledgeable people). As a result, a defective statement (a list of shortcomings), a phased plan for the necessary work is drawn up with an estimate. During the examination, special attention is paid to the state of elements responsible for the stability of the structure:

    Foundation. May be deformed due to changes in the characteristics of the soil. The presence of cracks on the scene indicates that the house sits down. Over time, the scale of destruction is growing, affecting the walls. They also appear cracks, and in log structures, seams and joints are expanding. If this happens, the foundation must be strengthened.


Works on strengthening the foundation, Pouring Game

    Walls. We need to be repaired if there are cracks and bulges (in brick buildings). In the latter case, the problem area is disassembled and folded. If the walls are in good condition, they can be given a presentable view, separating the modern facing material, without forgetting about insulation.

    Roof. In most cases, old houses are covered with slate. It must be replaced with modern material (for example, metal tile), easier, beautiful and environmentally friendly. Roof insulation.

    Wooden details. They are strongly affected by damage due to the effects of moisture, temperature drops and insects. The rafters, the beams of overlapping and floors with signs of wear must be replaced, the floors insulate.

    Interior wall decoration. They can be seized by plasterboard, getting rid of problems with cracks on the surface, or use another suitable way.

    Engineering networks and plumbing. Just like the interior decoration, do not affect the sustainability of the house.

Repair the old house or put new - more profitable

The old country dwelling can have a very crying look. Sooner or later, the owners will have to decide what is more profitable - to carry out the reconstruction of the old or erect a new home. The financial situation does not always allow to conduct major country construction. The decision on major reconstruction is taken after studying the defective statement and the assessment of the front of the work.


Capital reconstruction of the roof

If the foundation, carrying walls and floors are in a satisfactory condition, then the capital reconstruction will cost cheaper the construction of a new house. Perhaps immediate replacement will require the roof, carpentry and engineering networks, and this is a completely different level of costs. If basic designs came into disrepair, it is worth thinking about radical measures.

On our site you can find contacts of construction companies that offer the reconstruction service and restructuring homes. Directly to communicate with representatives, you can visiting the exhibition of houses "Low-rise country".

What types of work are performed when restoring country houses

Re-equipment of the house includes:

    strengthening the supporting structures and, if necessary, the foundation;

    repair of the scene, extension of the base;

    increasing the storey;

    redevelopment of the house (interior);

    an increase in the useful area (various annexes, arrangement of the attic under the attic);

    laying fireplaces and stoves;

    work on the insulation of walls, floors, roofing;

    internal repair work (partitions, floors, ceilings, stairs);

    facade cladding;

    upgrading engineering communications (gas supply, repair of water supply and electrical wiring).


Work on the insulation of walls - the indispensable part of the facade works

What gives the reconstruction and repair of the country house

Reconstruction and repair allow you to solve several important tasks:

    Extend the life of the structure.Compeated work, the use of modern materials and technologies will be converted to the house. All unfit elements are replaced, the rest are processed to prevent rotting and oxidation.

    Enlarge the useful area. Additional meters appear after the construction of an extension (with reference to the foundation), re-equipment of the attic into the attic, roof reconstruction (covered parking or barbecue area).

    AND use year-round. Thanks to insulation and insulation, a comfortable microclimate will be saved in winter.

    Updated home style.Landscape designer will select the plants and arrange the territory of the site, equipping the garden tracks and flowers.

Video Description

About how rebuilt and changed a garden house on video:

Drawing up a project of reconstruction

Since the reconstruction of the old house involves a complex restructuring, often associated with a change in the geometric size of the structure, it is logical to entrust the company that has experience with such objects. Each house has its own characteristics, evaluate which only professionals will be able.


Complex restructuring of the country house requires attention to detail

If the customer wants to sustain the floor, experts will determine whether the load will withstand the load and whether its strengthening will be too expensive and ineffective. Changes will also require the layout of the first floor, where it will be necessary to place the stairs.

The company develops project documentation, taking into account the characteristics of the house, fire and sanitary standards. The final version requires coordination in the relevant instances.

Video Description

How to insulate the house and attach a terrace to it on video:

Stages of work during reconstruction

    The customer calls or comes personally to the office, negotiates the departure of the technical specialist in the site, 15-20 minutes.

    Departure to the object, inspection, measurements (including photo and video photography) and primary consultation, 1 day.

    Drawing up a technical project and estimates for the reconstruction (taking into account the value of materials), the purchase of building materials, 7-10 days.

    Preparation of contract contract, 1-2 days. In the contract, you can register phased payment (each stage is paid after the execution).

    Preparation of the construction site, 3-7 days.

    Performance of work (taking into account the requirements of SNiP and Security Rules), according to schedule.


Thoughtful reconstruction conducted by an individual project

Cost of reconstruction of country houses

Many old buildings were used as temporary dwellings, so they were unlucky, often without communications. When the owners decide to turn such a house into a place where you can live all year round, without the help of specialists not to do. Even if the owner is a person working and skillful, it is unlikely that he has special skills and knowledge. And without them, they will not be able to reconstruct in compliance with all technological standards.

The cost of individual works during the reconstruction (Moscow region):

    Departure to an object with a consultation - 4-5 thousand rubles.

    Reconstruction of the foundation (work, material) 8-9 thousand rubles. per m / n.

    Roof repair (work, material) 6400-7500 rub. / M².

    Build frame. Outdoor walls - 320-350 rubles / m², interior walls and partitions - 300-335 rubles / m².

    Warming of frame and overlap, sound insulation of the inner walls (thickness 50 mm). 45-55 rubles / m².

    Outdoor wall cover (OSP sheets). 180-220 rubles / m².

    Installation of engineering communications (work) - 3.5-4 thousand rubles. / M.

    Installation of electric grid (work, material) 2.4-3 thousand rubles / m.

    Strengthening window and doorways. 550-600 rub. / PC.

    Interior decoration (work, material) - from 9.4 thousand rubles. / M².

    Exterior decoration (work, material) - from 4 thousand rubles. / M².


Overhaul, external finishing works

Some performers offer their services comprehensively. In this case, the prices will have the following form:

    Redecorating. 2900-3200 rub. / M².

    Overhaul. 5700-6500 rub. / M².

    ERRORORMONT. 8990-10700 rub. / M².

    Chernoval finish (excluding materials). 3000-3400 rub. / M².

    Finishing (excluding materials). 2700-3100 rub. / M².

Video Description

On how to make a veranda warm on video:

Options for reconstruction

The reconstruction of a private house is ordinary and with the individual process, with its subtleties and difficulties. The owners plans are much desires, from the transfer of partitions, before the construction of the terrace. But, as a rule, all works are tied to one of the options.

Option 1. Hope of unfinished structures

To fulfill all the work on the completion of construction, the efforts of the team of specialists are required. Around the existing structure, an external framework is erected, passing the completion of unfinished fragments; The frame may be internal. The completion of the cottage house includes the arrangement of communications and insulation.

Often simultaneously increase the total area due to the alteration of the attic in the attic. If this method is unavailable, you can use less practical: build an extension. In this case, an additional foundation will be required.


The completion of the country house - a common reconstruction option

Option 2. Alteration (reconstruction)

Most often redo the temporary structure into full-fledged housing. This option involves restoring damaged elements: the foundation and walls are upgraded, roofing and finishing works are carried out.

The depth of alteration is determined individually for each type of work. So, when converting a attic in the attic, the need to strengthen or replace the rafter system is determined. The quality of wooden elements is checked; If necessary, the fungus is displayed from the surface. It may be necessary to replace windows on PVC-structures. During the reconstruction of the two-storey cottage house, they change the inner staircase. The reconstruction of the house from the bar includes the processing of wooden surfaces with a protective composition.

If the family plans to live in the house constantly, the outer walls and the floor of the first floor are insulated. The usual comfort will create a bathroom with hot and cold water.


Construction companies have extensive experience in reconstruction

Conclusion

The reconstruction of the country house is logical to hold with the prospect, given the future needs of the family. It is important that all changes are made by experts who can take a technically correct and economical solution at any stage of the work.

Appeal for help to professionals will help to conduct a qualitative reconstruction of the country house, which is of particular importance for owners. Modern technologies will inhale new life in housing; The owners will have the opportunity to breathe fresh rustic air all year round.