How to put the wall with lining. We understand how to wash the outdoor and interior walls of the house

Method for creating a solid trimming of railway cars By connecting the boards with the help of a ship-groove lock, builders copied. The lining of the walls was practical.

The board looks beautiful, through slots when drying the wood and there is no warping. Installation is simple and accessible to all masters wishing to make the siding facade and warmly with their own hands.

Types of lining and destination

Restore the old cottage and bath, give them a new decorative appearance, make a unique and warm apartment, update the frame house, allows a tree. The nephew walked stubbornly after me, fulfilling the duties of the priest. He studied the lining of houses with his own way with his own hands, tried to lay a properly finishing material. Working, we discussed the lining and its ability to give the building a decorative look.

Walling for walls is made from various materials:

  • Wood.
  • A metal sheet.
  • Plate OSB.

Plastic and metal are used outside, in industrial premises, warehouses, the insulation is placed under them. The lamp is made from metal products, there may be other options. Pressed wood plates are used under painting. Finishing technology is simple, accessible to do it yourself. The lists of the lining are selected the same color profiles starting, an angle outdoor and internal, lining.

Kirill was interested in which the lining was the most popular and diverse. The tree has always been and remains the main building material. The panel uses natural wood. As always, my stories Kirill decorated concisely in the table. So it made and wooden lining.

Wood breed: Degree of moisture resistance: Application area:
Pine: low restroom, living room, facade, veranda, attic.
Spruce: low balcony, terrace, attic, loggia.
Linden: high bath, steam room.
Alder: high sauna, steam room, kitchen, cabinet, living room, children's, bedroom, bath, toilet, corridor, gazebo.
Cedar: average interior, facade, attic.
Larch: high pair, sauna, sauna, bedroom, kitchen.
Oak: high cuisine, bath, office, living room, hallway, corridor, gazebo.

Changing the walls of the tree can be facade and inner walls, make partitions. The direction of laying the plank can be vertical and horizontal. The shape of the section differs the lining:

  • Standard.
  • Eurovale.
  • American.
  • Block house.
  • Softline.
  • Landhauses.

Their main difference is available on the reverse side of the cuts for ventilation, the shape of the chamfer. Block House has an oval top, simulating a log house. The universal lock allows you to combine in one trim different types of finishing board.

Wall decoration with their own hands (video)

Facade clapboard lining

We arrived at the address. We had an old cottage that it was necessary to insulate, make a beautiful facade, save the walls from the destruction of the wind and the rain. Walls need to be lined with a clapboard, which already lay inside. With the help of the nephew, I quickly stated the main lines horizontal in the basement and washed the irregularities of the walls vertically.

We placed under the bars with a pitch of 40 cm to strifting the house with the wallpaper outside. The design of the concrete base made siding under the stone. The lamp was made from metal profile. Natural materials are perfectly combined with each other, imitation of the base of stone and wooden walls.


Kirill was wondering how to sneak the walls with lining, if they are uneven and wall material porous, swelling and swallowed. We cleaned the logs from dirt. Impregnated protective compositions. While the facade dried, prepared the planks and bars for decoration, a vapor barrier was mounted. The lining of the house is made in a strictly defined instruction. Step-by-step installation order looks like this.

  1. The horizon line installed the starting P-shaped profile.
  2. Put up the level and secured the bars under the frame at the corners. Nizhny end started in profile.
  3. They pulled the cords in the middle and at the top so that the framework was in the same plane.
  4. On the marked vertical lines and the cords installed the other bars. The mount was done through a trimming bar, putting it in the hinds.
  5. After that, the window and doorways were trimmed around the perimeter of slopes.
  6. In the interval between the lamps, the insulation was laid.
  7. Closed with a hydrobarier.
  8. Sewing with lining started each wall from the left left corner.

At first we put a rail around the corner to lay the ends on the same line, necessarily leaving the gap to the wrestling of wood. We mounted the first row of lamelters from above, screwing down the screws in every bar. The rest, taking into account the vertical location of the lamellae, fastened the lining with thin nails, scoring into the lower part of the castle. The next row was going with a displacement, before kid, left a small gap, because the log house could play.


When shearing with metal and plastic lining is used kleimer. It will start in the castle behind the lower part of the groove. We did with the use of the beamer the front wall of the facade with vertical cladding. How to strifting the walls with your own hands, is shown on the video. The location of the board depends on the desire of the host of the house:

  • Horizontal.
  • Vertical.
  • Inclined.
  • Christmas tree.
  • In a checkerboard.

The sketch is pounced in advance, and the bar is attached perpendicular to the direction of the facing. Putnocks, corner elements and decorative decoration by carved patterns is done after the walls on the walls are fully installed.

Interior decoration of walls


Kirill helped me to fulfill the next order, shelter the large room with clapboard in the house. The customer wanted to make a living room with a fireplace for the Provence style. We had to combine the finish. We leveged the wall with the fireplace by the method of dry plaster, used plasterboard. The crate was made of metal profile. After sealing the joints, the wallpaper was blocked at a distance from the fireplace. The focus was laid out artificial stone, making thermal insulation between stone and vinyl wallpaper.

Pine lamellas with profile Softline Thanks to a rounded chamfer from above imitate the laying of the bracket of the mustache. The casing material has a decorative species, especially the extra grade, on which the drawing without bitch. Look at the wall-cutting wall can be infinite. She is able to decorate any interior. Design in his manifold is shown in the photo.

The advantages of frame construction in the ability to quickly build a house, make it warm and beautiful. Twisted with Cyril to cope with the scope of work was difficult. We worked as a brigade in 4 people. The frame was installed earlier, the company for the production of ready home units herself delivered them and mounted.


Calculation, how many lining we need to close the walls outside and inside, I did, taking the size from the drawing of the frame. Now the lamellas were in advance. The length of each board was 5 cm less height. The idea to sew vertically clapboard under the block house belonged to a nephew. Original design and practicality combined in this decision. The textured wall looked in the streets decoratively and original. Water flowed, without lingering planes covered with varnish planes.

Horizontal rails under the fastening of the lining, at the same time kept minvatu laid in the framework of the framework. To start the trim, first lit up the rails horizontally to guide the decoration lamella vertically. In flat bar we will spin fasteners. A detailed action plan can be seen on the video. Street - front facade, decided to do the last.

By this time, a plan for decorative design of outdoor casing should be born in the head of our girlfriend Kirill. The appearance of the private house is of great importance. Used fasteners to cracks. They allowed to fix and direct each board separately, withsting the clearance under the extension. At the top set the final bar. Below was mounted with a cast.

Bath interior


Build a bath usually from pine logs. For interior decoration, the wood wipes of coniferous rocks is not suitable. She, heating, highlights the resin. With a small amount, the fragrance of the Christmas tree soothes, configures on vacation. The sauna creates an atmosphere of a strong smell, heavy air. Sewing walls in the steam room is better than a olte, isolated therapeutic aroma, or birch. Feature of the plating bath, the use of wooden nails. The metal has a high thermal conductivity and leaves the burns when contacting the body.

Durable, beautiful and comfortable facing material - lining - can often be found in the internal decoration of apartments and houses. It can also be used in the country, and when finishing the sauna; Metal or plastic lining in some cases is used even when finishing the facades. The secret of the beauty of the walls, finished by clap, is fully detected only with accurate observance of the laying technology of this material. Therefore, the question of how to lifting the flooring surface inside the house with your own hands is correct, very important: you can spend time and work, but not achieve the desired result.

Room, covered with clapped, looks stylish

We choose the material

If you select the lining for finishing inside, then it is better to stay in the following variants of the materials:

  • wood;
  • Dvp / chipboard;
  • MDF panels;
  • plastic.

Plastic is not accidentally delivered at the last place: despite the obvious economy, rich in the color palette and the ease of operation, it is still not eco-friendly and is mechanically durable in order to fully cover the walls to them. In addition, the material, although enough racks to the effects of elevated temperatures, nevertheless, is not distinguished by increased fire resistance. Already at 100 ° C and above, polyvinyl chloride (PVC) is the main part of the plastic lining - highlights an unpleasant smell, and with even higher temperatures begins to smooth.

Metal lining is too heavy to sow it a room. In addition, in the warm season of the year, the room decorated with such material will be very intensely heated.

Of the remaining three options, preference in most cases give products from wood. The fact is that the walls covered with clapboard from chipped pressed materials, subsequently need to be painted, or cover transparent varnishes that imitating one or another wood. This will delay for a while work on finishing at home inside.

Wing from the Fiberboard needs to be lacquered

If the choice is made towards the wooden lining, then the optimal color and textured solution of the panels should be chosen in advance. With a large positive superiority in front of other materials in terms of environmental friendliness, excellent protection against noise, and low thermal conductivity, lining made of wood - quite expensive material.

Therefore, if you decide to shelter the house with a wood with a clapboard from a tree, then it costs to the highest-quality varieties of material - extra, a or V. Class C lining to decorate the technical premises of the house - pantry, hallway.

In addition to the class of finishes, the type of wood matters. For example, cladding of coniferous rock trees is conveniently styling and will provide the most healthy atmosphere. The room lined with such material will never leave the fragrant smell of resin.

Preparing for laying

Pre-room must be prepared for installation: carry out the entire inner wiring, place space for sockets and switches. It is worth doing, consulting not only with the convenience of use, but also taking into account the dimensions of the mounted panels, so that it is not to perform unnecessary joints and not to install the challenges. The same applies to places where there is a window or doorway.

Prepare for laying need not only room, but also the lining itself. If the walls of the wall are in the cold course of the year, then the material brought from the store should be brought out indoors at least two days. When covering with your own hands with high humidity (for example, inside the bathroom), all panels should be treated with moisture-resistant varnish (preferably in 2 layers), let them dry and only then start mounting. Between the first and second coatings, the material is treated with a sandpaper to zoom in the surface smoothness.

From the necessary tools for the trim, they will need:

  • hacksaw,
  • building stapler,
  • a hammer,
  • recess
  • level,
  • kern.

To work need a set of tools

Cooking the surface under the trim

Methods of laying lining inside are few, choose from three:

  • vertical;
  • horizontal;
  • inclined stacking.

The last way is widespread much less: do it yourself to sow surfaces at an angle and expensive, and visible advantages, a coma of the original type of finish coating, no. In other cases, focus on the following rules:

  1. For the sheat of the walls in the attic, only the covering horizontally applies.
  2. Vertical covering visually increases the height of the room.
  3. Horizontal covering visually makes room wider.

Deciding with the way of laying, begin to prepare walls - they should be even, which is checked with a plumb. All surface flaws should be eliminated: cracks are covered, recesses are chosen. If the house is not wooden, then leaf insulation is joined to the wall. In combination with the air layer between the crate and the wall, it will serve as an additional barrier for leakage heat.

You need to correctly execute the crate under the lining

Installation of slat plackers are produced in the direction perpendicular to the direction of laying of the lining: for example, with a horizontal method, the plank cladding is attached to the wall vertically, and vice versa. As collaborators, wooden bars are accepted (wood should have normal humidity and pre-treated with antifungal composition). The minimum cross section of bars - 20x40 mm.

The location of the bars mounted on the walls is conveniently taking a chalk cord or marker. With a horizontal cage, the step between adjacent bars is taken within 400-600 mm, and the first and last row are set with such a calculation to ensure convenient mounting of the lining. For the lower row, an amendment is made to the next installation of the plinth.

Between individual bars it is worth leaving a small gap (5-10 mm) - this will ensure the best conditions for air circulation. All windows and doorways are squeezed by the same bars. If the house is wooden, then the bars can be attached to galvanized nails; For brick and especially concrete walls, exclusively dowels are used.

Similar are the requirements for the seventure and installation of bars in the case of a subsequent vertical cladding.

We carry out installation

Particularly thoroughly, the first material panel should be installed: its accuracy will determine the quality of the entire subsequent sheat. We are usually beginning with one of the distinguished rooms in relation to the door corners. The board is exposed using a level, and it should be perfectly even (in the presence of roughness, their ruble should be eliminated).

Installation starts from far wall

The wooden wall of the panel is naked with decorative nails with a coating, harmonizing in color with the interior solution. If there is no desire to contemplate the nails caps every day, it is necessary to apply a silent nails that are clogged with a dull core. It is correct when the angle of inclination of the nail with respect to the surface of the lining will be approximately 70-80 °.

Many manufacturers, in particular, Eurovantia, supply their products with special clamps. These clamps with nails or brackets (in the latter case, a construction stapler is used) attach to the crates of the crates, after which they are fixed with their material panels themselves.

Work on the lining of the clapboard is completed with the installation of wooden corner elements - in the corners of the room and the openings.

Often, in order to find an answer to the question of how to see the walls with their own hands, you have to hire specialists, which, in turn, leads to the need for additional spending. Thus, the cost becomes double - for the material and directly work. Nevertheless, carry out the facing of walls, both external and internal, you can well with your own hands. Plus it will save money.

What is the finish

Clapping wall cladding has plenty of positive sides. First of all, thanks to this type of finishes, it is possible to obtain not only an attractive view of the walls, but also their high ecological purity, since the panels are made of pure wood.

In addition to the naturalness of raw materials, it is worth noting the simplicity of laying such a material, to cope with this task, even to the amateur. However, often after mounting the lining will have to make an additional coating in the form of paint or to achieve a high service life from aesthetic and practical point of view.

Thinking over the question of how to shelter the house with lining, usually try to solve two paramount tasks during the repair:

  • Protect the house from natural impacts, especially in the conditions of an unstable climate;
  • Cosmetic Terms, To impart beauty by the room.

It is important! The price of the lining is really attractive. It is worth considering the fact that it is possible to do without the help of the panels without the help of specialists.

Mounting

For example, it is desirable to use lining with the required moisture level, it is desirable that the products take place through the autoclave. In principle, raw products can be purchased at the end of spring, driving it in the summer, it is possible to start in August.


Wall sheat tools

  • Molded itselfwhich can be made from a variety of wood. Most often, aspen is used to cover the walls of the room. Provided that the room does not plan a sharp leap of the temperature regime;
  • Special barswhich are necessary for mounting the crate. Their mount is necessary in a step of 40 or 50 centimeters;
  • For fixing the design requires self-sufficiency or dowel, it all depends directly from the material that the walls are made;
  • To secure slats to the base, kleimers are needed. On video, you can see that there will be more carnations and brackets;
  • Stapler, small hammer, it is more convenient for the final stage;
  • The last action of the installation of the lining is the application of the finish layer. On the already finished design, for this purpose you will need any or simple varnish. Choose the coating should be selected depending on what conditions are planned in this room;
  • For wood requires special quality primer.

It is worth paying attention! For additional insulation of the walls, which is carried out at the installation stage of the lining, the thermal insulation material should be used, as well as a membrane that does not transmit steam and moisture. Particularly important membrane is especially important in case of finishing the external walls of the structure

Installation of crates

Often, the wood panel can be attached directly to the old surface of the walls, provided that the surface has a flat plane and at the same time strong and durable.

Nevertheless, if you wondered how to shelter the log cabin, it is better to make preliminary installation of the crate.

Create a crate is not difficult, the most important thing is to observe some moments and nuances.


  • The carrier element of the crate has a unified dimensionsThey should not exceed 20x40mm. In the event that the installation of thermal insulation is necessary, it should be taken into account its thickness when mounting the crate. As for the length of the racks, it depends directly from the size of the room;
  • Bashed the crate should depend on the materialFrom which the walls are made. For the wooden base, the use of self-tapping screws will be required, while only a dowel will be suitable for stone or bricks. Step more than 50 centimeters is not rational and dangerous;
  • Racks are located perpendicular to the panels, And the elements themselves themselves can be installed as desired vertically, horizontally, or even the painter;
  • It is worth noting that all components of the frame are necessarily lying in the same plane.To obtain an even result, it is necessary to use the level. Help in alignment can pre-harvested wedges of wood.

It is important! So that the supporting structure is the most durable, one-piece timber should be used. The use of parts of the bar significantly reduces the service life.

Installation of panels

When going to think about the question, how to sow wall clap, should determine the choice of installation method. Moreover, you should cut the right amount of boards, for which it is necessary to measure all the starting surfaces. This will make it possible to use the material rationally.

Locking panels to the crate can be carried out by three in the following ways:

  1. . This is the most optimal option, since they do not have to drive any elements into wooden lining. As a result, the facing is obtained very neat and quite reliable;
  2. Using a stapler and brackets. This fixation is called broken, since the mounting of fasteners is carried out at an angle of 45 degrees. Place installation bracket - spike each panel. Each regular board will enter without problems in the previous one;
  3. Use nails. This mount is also considered secret, with its principle similar to the use of brackets. Differences in the use of fasteners, besides, it is important to use hammer-Dobochnik, which allows you to drown a hat.

Note! It is intended to translate into reality how to enjoy the room with a clapboard, you can apply any of the methods described above. Nevertheless, there are other ways.

Further processing

To complete the laying of the lining, the finish layer should be applied, it may be varnish, paint, special impregnation or glaze. It is generally accepted to use paints that usually deprive the wood of all its natural properties.

In principle, on the market you can meet such coatings that pass the air, but their color scheme closes the natural pattern. When going to solve the task, how to properly stripping the walls, it is necessary to study all the properties of paint coatings in advance.

How to choose high-quality material

To separate the room that can have different purposes, high-quality material is needed. However, there are certain characteristics by which the material should be selected, allowing you to answer the question of how to lift the walls of the wall.

It is worth paying attention to the wood of wood, as well as directly to the class to which this lining refers.


Buying wooden panels for external walls

Sewing the room outside is necessary not only in decorative purposes, but also in order to protect the building from any influences of nature. Here it is necessary to pay special attention to the tree of wood.

It is necessary to obtain such a coating that will not fight dampness, temperature drops, as well as the effects of precipitation and other indicators of an unstable climate.

The most preferred breeds are:

  • Oak. It is very successful for the outer decoration, since it is characterized by characteristic signs of resistance to external influences, durable in terms of operational timelines. In addition, the color range of it is quite wide - from light yellow to dark red shades;
  • Larch. Excellent tree for use in raw climates, since it is quite resistant to such a process as rotting. The structure of the tree is very pronounced. If we talk about minuses - then it is too complicated processing of raw materials for the manufacture of wooden panels. This leads to too high cost;
  • . Representative of coniferous, resistant to rotting. Distinguish interesting tones;
  • Merbau. The option is more exotic, distinguished by an interesting texture. Speaking about dignity, the resistance to ultraviolet rays, humidity and too sharp temperature fluctuations should be highlighted.

It is important! Almost any wood species can be accessed to finish the walls outside, while it is desirable to choose the most valuable, which will ensure the durability of the construction of the construction.

Purchase of wooden panels for interior walls

Learning how to see the walls of the wall inside the building, it should be noted that the inner side of the house is deprived of a negative impact of the precipitation or the effect of ultraviolet. Accordingly, from the inside the house can be faced with less stable rocks, which, however, have the highest indicators from the point of view of aesthetics.

Examples are used by:

  • Maple. Endowed with wide range of colors. The texture of noble flaws in this breed is practically no, is durable, easily processed;
  • Ash. Very promoting for the design of walls inside the building. On its surface there are minor vascular, which allows you to get interesting ornaments on a cut;
  • Nut. It is characterized by hardness, which is nevertheless absolutely does not interfere with the processing to create lining. May differ in color and structure, depending on which region is growing in. Even with a long period of use, the panel of nuts are not deformed;
  • Cherry. Noble shade that makes this tree breed recognizable. However, over time, the Wood Cherry darkens.

It is important! For interior decoration, there are much more possibilities in terms of whether the type of wood. This allows you to significantly diversify the options for designer solutions.


Conclusion

The instruction above tells on how to shelter the wall with the wall, both inside and outside. The most important thing is to calculate the required amount of material for work, it is easy enough to do, calculate the area of \u200b\u200beach surface.

Siding can be seen of any destination. It will hide disadvantages of the wall of the walls, protect them from atmospheric influences and give the facade a decorative and well-groomed appearance.

This article will consider the sequence of work on how to enjoy the house by siding. And also at the end of the article, a visual manual is attached - how to shelter siding house, video.

Tools for making crate and mounting siding

  • Hacksaw
  • Construction or laser level
  • Roulette and construction kit
  • A hammer
  • Drill
  • Screwdriver
Sayding Mounting Tools

Calculation of the number of materials

Measuring the parameters of the outer walls are carried out. The height of each wall is divided into a useful height (without a lock) panel. The total number of rows multiplied by the number of panels in each.

5-7% of the resulting number are added to waste.

The length of the material for the starting plank is calculated, based on the perimeter of the house, making an increase on possible joints. The finish bar is calculated similarly by adding the amount required under the windows.

The exterior, as well as internal angles calculate the piece by measuring the height in the appropriate places. The coil profile is considered to be around the perimeter of windows.

Connecting Planks (H and G Profiles), calculate the piece Depending on the number of rows on the wall and other connections.

Surface preparation

The carrier base for siding panels, insulation and vapor barrier is a framework. It is erected from a metal profile or a wooden bar.

Before the start of installation, walls are prepared: removal, lighting devices, window shutters, storm gutters. The old base is repaired: cracks close up with a solution, metal elements are processed by primer.

Marking of the walls and installation of the crate

To dry the walls in the upper parts of the corners, the holes are drilled, where the pieces of fittings are clogged 20-30 cm long. Rods are lowered with rods and lower rods are inserted into the prepared holes.

Important: Between the upper and lower rods stretch the twine, thanks to which you can install, smooth walls, and adjust the beacons.

The framework of the framework uses profiles intended for mounting drywall. Their resource allows you to freely withstand the mass of siding and insulation. The base of the CD of the profile is vertically installed on the base or breakfast, withstand the distance between their axes at 40-50 cm.

To mount the framework it was more convenient, the UD profile is installed at the bottom, which set the vertical parts of the crate.

Places where Siding fittings will be installed, are additionally strengthened with paired CD profiles. Around the windows, doorways, in the upper part of the walls, jumpers are installed from this profile having a greater width of the mounting area. The window bar of siding is attached to the frame or next to it using the UD profile.

According to the verified vertical lines, with a step of 50-60 cm, direct suspensions having a P-shaped shape are installed and attached to dowels. If the walls are uneven and the framework will significantly defend the base, the suspensions are replaced with consoles made from profile cropping.

The suspensions allow strictly for a given line to install vertical racks, fix them with galvanized screws 9.5 mm. Start mounting from extreme profiles, between them stretch the cord for even mounting intermediate racks.

On the front alone, the siding planks often have vertically. For this, the frame racks are horizontally.

Fastening accessories

The fittings decorate the facade, gives it a complete appearance and protects the connection points from moisture and dirt.

For facing the facade, the following elements are provided:

  • External and Inner Angle
  • Start strip
  • Finishing strip
  • Chamfer, panel for cornice
  • Window Planck
  • Concubine
  • Drain
  • N - profile, connecting plank

Facing Facing Facing Accessories

At the in-depth in the opening of windows and doors use the window bar. This item covers the slope and beautifully draws out an outer angle. The final strip is recorded at the frame and the logbook.

When the windows are not deepened, but are in the frame plane, platbands are used as the main fittings.

The final band of windows and doors is installed at the top of each wall in the place of the adjuncing to the roofing bundle. This is completed.

Fastening starting plank

When the frame is fully assembled, with the help of the level determine the lower point of the future cladding. From this point in all corners of the building, tags horizontally are put on the horizontal, they are indenting an indent to the width of the starting strip, the line of which is performed by a cord. This line is the place of attachment of the top edge of the starting plank.

The starting strip is fixed with self-pressing in a step of 20 cm. To do this, the side of the working plane of the frame was placed horizontal jumpers.

In place of the compound of two starting profiles, the temperature gap is left from 0.5 to 1 cm. The same clearance is kept in the place of attachment of fittings.

It is worth noting that the start of installation of any type of siding begins with the mounting of the starting plank. It also begins with her. By the way, vinyl siding is the most popular and purchased among builders.

Further, among buyers, metallic siding is appreciated. Installation of metallic siding with your own hands is fairly simple and easy. You can mount it yourself without referring to construction companies, accordingly save funds. Guidelines for the installation process of this material are presented.

Insulation

Suitable particles of insulation are placed in the frame cells. It is possible to secure the insulation mats with plastic fungal dowels. On top, a diffusion membrane is fixed to the crate, which does not give mats wet.

Insulation of polystyrene foam in protection against moisture does not need.

Corner Planks

Inside and outside, they are installed 0.5 cm below the bottom edge of the starting band below, at the top - by 0.5 cm without reaching the top edge of the wall. The angle is slightly fixed in the upper mounting hole, then the vertical is unwrapped with a plumb. Only after this, the profile is fixed with self-draws or nails in a step of 20 cm.

If there is a need to connect two angular slats in height, the nest must be 2 cm.

Siding installation with your own hands

When a durable frame is installed and the necessary auxiliary elements are fixed, the facing panels are mounted quickly.

The lower panel is fixed in the lock page lock and from the middle to the edges is fixed on the frame racks. Each next panel enters the castle of the previous one, is tightly connected along the lower edge and fixed from the middle to the edges.

Often at the viewed areas you can make the joints of siding in length, the backstage is 6-10 cm.

The last panel is most often cut: Entering the final strip, it should not be removed by the upper edge. With the help of Punson, the holes are made through 15-20 cm in its edge. The perforated edge is started in the final strip. The same reception is used under the windows and where the final band is installed.

How to mount siding?

When mounting siding, it is necessary to take into account some features, such as:

Siding without considerable effort and costs allows you to update and insulate the facade, give the building an elegant and more expensive view. Correctly mounted, it retains strength and geometric stability to decades.

Video about how to entertain siding house

Video instruction that shows the installation of siding panels and components.

Siding lining is a popular appearance of external facing. Suitable for many types of residential and industrial buildings. This option is especially relevant for buildings of foam block and sip-panels.

The light weight of the finishing material does not have a greater burden on the base of the structure, so you can wash with siding with old wood structures. Siding's popularity is associated with its low cost, long service life and a wide selection of textures, color scheme.

    Show all

    Preparatory activities

    It is from the quality of the preparatory work performed will depend on the quality of the external finish and its life. The essence of the preparation in the following:

    1. 1. Remove the protruding elements.
    2. 2. With the help of a mounting foam, fill the available gaps in the walls, near the windows and doors.
    3. 3. The surface of the external walls of the building is cleaned from the accumulated pollution. Remove the old finishing material, mold and fugged parts.
    4. 4. If the facing will be performed on the walls of the tree, they are treated with antiseptic solutions.
    5. 5. Walls from foam block to treat deep penetration with primer composition.

    Cutting device

    Highlighting a frame, you need to comply with such events:

    1. 1. Mount the vertical bars 30/40, 50/50. Metal racks can be used - PP 60/27. Applying wooden products, they need to be treated with antiseptic.
    2. 2. When installing vertical racks, a distance between them is 40-60 cm.
    3. 3. Mount the timber to the walls of the suspension. They can be shortened, medium or elongated type. Choosing between them, you need to know the thickness of the heat insulator, from which the distance depends on the wall to the material.
    4. 4. Fastening of the suspensions to the wall is carried out by self-draws. When finishing a wooden building, siding to mount bars to the wall can only be as if it is smooth.
    5. 5. Place the angles by connecting racks with each other. Watch that they are tilt to each other at 90 degrees.
    6. 6. Installation of the crate is carried out after installing angular racks. Between them lay the cord. It is necessary for fixing the rest of the racks.

    Insulation

    The laying of the thermal insulation material is carried out in the gap, which was formed between the crate and the wall.

    For this, a different insulation is suitable:

    • minvatu;
    • styrofoam;
    • penoplex.

    For maximum reliability, the thermal insulation material is additionally fixed to the wall.

    More details about the arrangement of the frame and insulation from the following video:

    Corner profile fasteners

    Installation can be carried out only after the drainage of the foundation is installed. Its upper part will be focused along a previously indicated line. Although this design is characterized by rigidity, it is much easier for its fastener than the elastic starting panel. Corner profile Mount Samores. Secure them in the top of the hole. Next fastening elements in its middle.

    To increase the length, install the top bar to the bottom with the edge of the edge, which will be 2-3 cm. According to the test line indicated in advance, the first bar is mounted. Retreat from the lower edge of the angular profile up 5 cm and attach the first strip.

    Near the window mount window planks. It is necessary to do this so that the external edge compared to the outer is focused below the level of 2-3 cm. For facing door openings, use the J-profile. The angles of these slats are sharp, and you can get them using the method.

    For vertical installation of n-profiles, the level is used in predetermined locations. Leave a gap of 5-6 cm to the level of cornice and foundation. This will protect the bar from the deformation when expanding. The j-profile is fixed where the end of the roof.

    Fixing panels

    Starting finishing work, it is necessary to comply with the following recommendations:

    1. 1. The fastener of the initial panel is led by self-drawing. It is fixed in the longitudinal direction to transverse racks. Bring out the bottom of the wall. The feature of the fastening of the material is that the finish is performed by moving upwards.
    2. 2. Each canvas is equipped with grooves at the bottom and above. Insert the lower part into the starting panel, and to wear and snap the second row panel to the upper groove.
    3. 3. On the side sides of the siding there is a cutout. Its main task is to ensure that one panel goes to the previous one. This avoids the gap between them.
    4. 4. When the J-profile is fixed on the last row of siding, the wall cladding is over. Siding provides for the presence of ventilation holes, so that the installation of vaporizolation is not required.

    More about covering siding can be found from the video:

    Fronton covering

    For the finish of the front, it is necessary:

    1. 1. To equip the framework in advance. Fixation of bars is conducted by self-drawing. Between them, abide by the distance of 30-40 cm. Installation of the crate should be conducted near the openings, in the corners, top and bottom of the front.
    2. 2. The finish is performed first on transverse external and internal angles. Then the connecting plank is installed. Screw the fasteners into the upper hole, and then in the remaining.
    3. 3. When all vertical strips were recorded, you can mount the initial strips. With the help of the J-profile, it is fixed with a near city.
    4. 4. Upon completion of the installation of the fittings, you can mount siding rails. Vinyl rail is included in the castle of the initial strip. Strengthening the top panel occurs using a J-profile.

    Fronton finish clearly provided by the following video:

    Finishing at home Siding today is one of the most popular. This is explained by an attractive appearance of the house, low cost and simplicity of installation work. After spending a minimum of time and effort, you can insulate the house, protect it adverse atmospheric factors, give a presentable view.