Building from Ytong blocks. Aerated concrete houses (Ytong) Yutong turnkey houses

Xella's Ytong wall material is aerated concrete, which stands out among other building materials with excellent thermal insulation and high technical characteristics. Despite their low weight, Yutong blocks are strong enough, fireproof and resistant even to earthquakes, so they can perfectly compete with both brick and wood, combining the best properties of these materials. Such blocks are in great demand among private developers and large construction companies, as they have exceptional properties and affordable prices.

According to experts, such aerated concrete blocks are ideal for building exterior and interior walls of buildings. This material is especially popular in the construction of private low-rise buildings.

Advantages of Ytong Aerated Concrete Houses

Ytong aerated concrete blocks have the following advantages:

They are environmentally friendly: quartz sand, water, cement, lime, aluminum paste are used in the manufacture, and these materials are completely harmless to health;

Possessing a porous structure, the construction of Ytong blocks eliminates the appearance of mold and dampness, and also makes the building fire resistant;

Despite the fact that the blocks belong to the "concrete" group, they are very easy to process. This quality increases the demand for this building material, because using the simplest tools: blocks can be sawn, drilled and trimmed without much effort. Thus, it becomes possible to reduce the amount of construction waste and labor costs;

The blocks have exceptional thermal insulation (thermal insulation properties of concrete are 13 times lower, and hollow bricks are 4 times lower). The construction of houses from Yutong guarantees the preservation of a comfortable microclimate in the room, regardless of the time of year - this is due to the presence of a special microporous structure in the blocks. Ytong aerated concrete houses do not need additional insulation, and air conditioners can only be installed at the request of the residents themselves;

Seismic resistance, excellent sound insulation properties and low weight. Houses made of Ytong blocks are distinguished by their lightness, so they have increased resistance to earthquakes. At the same time, it does not matter what type of earth rocks - construction will be as safe as possible;

High-precision production of blocks - the error can be no more than 1 mm. For masonry, an adhesive is used, so there is no need to use additional plaster;

YTONG aerated concrete blocks are very durable and designed for high loads;

With its compact size, Ytong material saves on transportation.

Building a house from Ytong blocks is an opportunity to build lightweight buildings with high strength!

For the construction of your home, we will provide you with the highest quality materials so that you can make your dream of a cozy and comfortable home come true.

Assortment of Ytong blocks

To ensure the construction of Ytong blocks, our company supplies the widest range of blocks:

  • Wall aerated concrete blocks;
  • U-shaped aerated concrete blocks;
  • reinforced aerated concrete lintels;
  • prefabricated monolithic ceiling;
  • arched blocks;
  • blocks for interior solutions.

We not only supply blocks to construction sites, but also assist in the design of future structures. Our company has an individual approach to each client, helping to select and deliver materials, as well as build a Yutong house that will be warm and comfortable!

The ECOS construction company is engaged in the construction of houses from YTONG aerated concrete, therefore, at the time of drafting the project, the technical characteristics and properties of gas blocks must be taken into account. Projects for aerated concrete houses are made in accordance with the standards and regulations of YTONG technology, since the company's employees are certified partners of YTONG.

Guarantees for ECOS clients

For the construction of each aerated concrete house, projects are not limited to specific frameworks and requirements, so all customers have the opportunity to translate into reality any requirements regarding the layout, area of ​​​​the building and the arrangement of rooms.

Projects of turnkey aerated concrete houses are not limited to standard options, but are based on company standards and regulations. All projects of small houses have been tested and implemented repeatedly, so customers can be sure of creating an energy-efficient, durable and safe house from aerated concrete.

The production time for projects of aerated concrete country houses can reach several working days, depending on the level of complexity of architectural documentation. The preparation of a project for a country house made of aerated concrete can be affected by the area of ​​\u200b\u200bconstruction, the level of technical complexity and the presence of personal wishes regarding construction.

For a house made of gas blocks, projects and prices will include a full package of technical and architectural documentation that will be required in the process of building a country house from aerated concrete. Building a house and preparing a project for a house is always accompanied by long-term warranty obligations, so all customers receive a guarantee for a period of about 5 years, as well as long-term warranty service.

The main advantages of working with ECOS

The construction company "ECOS" offers cooperation to private and corporate clients who wish to organize the construction of a capital house from aerated concrete. At the disposal of clients are ready-made projects of aerated concrete houses with a simple standard design or an individual turnkey layout.

Thanks to the partnership of the ECOS construction company with the YTONG brand, all customers have the opportunity to buy ready-made projects of aerated concrete houses for the organization of capital construction. Have you decided to buy ready-made projects for an aerated concrete house? Evaluate all the advantages of the EKOS company:

  • an individual approach to the design of an aerated concrete house for each client;
  • preparation of a cash estimate for the house and drawing up an agreement under which payment is made;
  • warranty obligations for each house;
  • professional specialists who are well aware of YTONG house construction technologies.

Interested in prices for the preparation of a house project? Call or write to the manager of the construction company to agree on the terms for creating a house project and order an individual project of your own house.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TK-visualization, painted. The plinth is lined with decorative stone.
    interior decoration: the decoration was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready Project of his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was precisely such a difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be erected in a short time on the existing foundation. Dmitry and his family had a desire to build a new high-tech house. After careful measurements, a project was made that took into account the old layout, but had a new modern form with interesting innovations! The house has an entrance group where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our lane. To implement such a roof, we called on our knowledge and modern building materials to help us LVL beams, built-up roofing and much more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section of country architecture in high-tech style, in the style that bold Customers with excellent taste choose.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in their own house in nature there are many opportunities and fresh air. We, in turn, were happy to work on an individual project of a classic red brick house with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement is insulated with 200mm basalt insulation; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, the long work on the project, the construction of the foundation, the construction of the house with the exterior and then the work on the interior! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different finishes, comparing their cost. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become a happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good person! Rumyantsev Andrey came to our company with a desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house ... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "individual 8x9m"

    House options:

    What was done

    When Customers come to us with bright, modern ideas for a future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in a wooden house, and it was necessary to build a house in a short time, and the frame construction technology became an ideal solution for such tasks! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

Ytong blocks are gas silicate building blocks of the autoclave production method. Made from sand, lime and water. According to engineers and crews, they are the best wall material for private cottage construction and large-scale high-rise construction in Russia.

The main advantages of Itong blocks (building a house from ITONG blocks)

  • Thermal insulation properties when laying house walls
  • Soundproofing properties of the walls of the house
  • Lightweight and easy to build
  • Good barrier properties of the material
  • Block with convenient geometric proportions and correct geometry
  • Inexpensive when buying the whole volume
  • Delivery in Moscow and Moscow region

You can order delivery and buy Ytong Blocks and other wall building materials in the online store of Russkiy Dom LLC

Building a house from ITONG blocks is the most common way to build suburban real estate in Moscow about the region. The material for the walls is a light and inexpensive ITONG block. What is hidden under this name? Firstly, it is a building material for walls, partitions and even floor slabs. Foam concrete, foam block, aerated concrete, gas block, gas silicate block - the customer calls all this with one weighty word - FOAM BLOCK for building houses, and he is right!

Secondly, why is it good for building houses and cottage construction in general? And the fact that in one material there are two characteristics at once - a reliable wall insulation and at the same time - these are strong walls for centuries. For example, with an outer wall thickness of only 30 centimeters, we achieve the thermal performance of a brick wall of a house with a thickness of 1 meter. In view of its uniqueness (as a heater and as a load-bearing wall), the estimate for building a house from ITONG is small relative to the cost of a solid brick wall.

Today there are a lot of manufacturing plants, but it is the Ytong (Itong) blocks that are used by the Russian House construction company when building their stone houses in the development of cottage settlements in the Moscow Region and far beyond its borders.

The cost of building a house from ITONG blocks

What is the cost of building a house from ITONG blocks? And so in order. The construction of houses from ITONG, like the construction of bricks, is based on the masonry of the walls of the house. The main block sizes used in modern house construction are 200 x 300 x 600, 200 x 400 x 600 mm. The material of the walls is light both physically and during its installation there are no difficulties. But the foundations should be made to the depth of soil freezing - for our region 1.5 meters or more.

When erecting load-bearing walls of stone houses, blocks with a density of at least D500 are used, and for insulation D400 and below. This wall material makes it possible to use both hollow-core PC slabs for flooring and to make a monolithic floor.

For external decoration of walls made of foam blocks, front brickwork is used, as well as plaster with putty for painting and decorative plaster to highlight rusts and inlay the facade of the house.

The cost of building a house from ITONG blocks is low and fits well into the budget rates. The first step to build a country house of your dreams is to choose projects of stone houses from the catalog of Russian House LLC, then call us and our engineers, together with the company's estimator, will provide you with an estimate for the construction of your chosen stone house.

(outer wall thickness 400 mm) per square meter without facade finishing, including the cost of wooden beams for flooring and temporary stairs to the second floor of the house (house design and its redevelopment - free of charge, in case of a construction contract) 16000
The cost of building a house from ITONG blocks (thickness of external walls 400 mm) per square meter without finishing the facade, including the cost of a concrete floor and a monolithic staircase to the second floor of the house (house project and its redevelopment - free of charge, in case of a construction contract) 18000
The cost of building a house from ITONG blocks (thickness of external walls 400 mm) per square meter, including the finishing of the front brick facade and the cost of a concrete floor and stairs to the second floor of the house (house project and its redevelopment - free of charge, in case of a construction contract) 22000
The cost of building a house from ITONG blocks (thickness of external walls 300 mm) per square meter including additional insulation and finishing of the facade from decorative plaster "fur coat" or "bark beetle". The price includes the price of a concrete floor and a monolithic staircase to the second floor of the house (the project of the house and its redevelopment are free of charge, in case of a construction contract) 25000

The foundation of the house from ITONG blocks

The foundation of a house made of ITONG blocks, like any other foundation of a house being built, must be strong and reliable, since a strong foundation is a guarantee of long-term operation of the entire building. When building a house from ITONG blocks - this is just as important! The creation of a foundation for such a house should be carried out taking into account the estimated depth of soil freezing. In each individual case, the calculation of the depth of occurrence is individual and depends on many factors - the construction area, the area of ​​\u200b\u200bthe roof, its design and slope, concrete floor, stairs, operating loads, and so on. The main types of structures that can be used as a foundation for a country house, laid out of foam blocks, are discussed below.

Facade for a house made of ITONG blocks

Facing houses from ITONG blocks and which facade to choose? The cost of such construction? And so that the walls serve for a long time and are beautiful, they need a front finish. The facade of the house is the cover of the family! Each customer who builds his house, sooner or later, faces a wide choice of modern finishing materials that can be used for the facade.

The most popular options for finishing the facade during the construction of the walls of the house according to the project from light foam blocks:

  • decorative plaster cladding - the most budgetary and inexpensive construction option; This method is suitable if the walls are built from foam blocks that do not require insulation for our region, namely, the 400th or 600th block. Cement-sand plaster has a number of advantages - strength, durability, practicality. If the plaster is applied in compliance with all norms, then as a result the walls will be smooth, without chips and cracks. This material has good resistance to mechanical stress and precipitation (snow/rain/frost). Plastered walls can be painted in any color you like, and then repainted as many times as you want.
  • face brick cladding - the most beautiful and durable type of home decoration; And therefore, if you want the facade of your house to be durable, have high frost resistance and serve for many years, have low water absorption, and be unique and beautiful - choose facing ceramic brick, which is represented by a wide palette of colors and shades to the most trendy and bright shades. . If we talk about brick, as a facing material in general, then facing can be carried out both simultaneously with the laying of the main walls of foam blocks, and after.
  • cladding with clinker tiles - the most popular option for today among buyers of finished houses or independent developers. Externally, the facade of the house made of clinker tiles is indistinguishable from the facade made of facing bricks.
  • plastic siding cladding or a ventilated facade - a popular option for decorating walls made of foam blocks or aerated concrete, can often be found in SNT and KP areas in the Moscow region.

Advice from the Russian House company - facade material for walls made of foam blocks is a very important element of any home. Choose quality materials, regardless of whether it is a budget plaster or a premium face brick. What material you choose will determine the operating costs of maintaining the house in the future. Do you want to build a house for the ages? Choose the right materials!

Roofing for a house from ITONG blocks

And after the construction and erection of the walls of houses according to the project from foam blocks comes to an end, the time comes for the roof - the company "Russian House" offers several options for roofing for a house from ITONG blocks.

Finishing a house from ITONG blocks


The construction of turnkey houses with finishing is our main task, we strive to simplify the process of individual construction for the customer as much as possible, whether it is houses from ITONG blocks or other material. We carry out a full cycle of works. We provide a beautiful design and construction of a country house with all utilities and, of course, we make houses with finishing, which allows the customer to deal with only one contractor. It's very convenient!

After studying the prices on the Internet for the implementation of such work, we recommend that you contact our specialists who will advise on the cost of finishing the house. The final cost depends on many factors - the amount of work, materials, location of the house, etc. therefore, when studying the prices for finishing work from our company or other companies, always check the details by phone with managers.

Draft repair houses from ITONG blocks per m 2

- Distribution of water supply pipes
- Electrical wiring
- Plastering works
- Floor screed device
- Removal of construction debris
5000
Overhaul houses from ITONG blocks per m 2
- Dismantling of old coatings
- Installation of interior partitions

- Replacement of water pipes
- Floor leveling (screed)
- Laying laminate, linoleum, parquet boards
- Preparing walls and wallpapering
- Stretch ceiling device
- Laying tiles on floors and walls

- Cleaning up after work
7000
Elite renovation (European-quality renovation) houses from ITONG blocks per m 2
- Design project
- Dismantling and installation works
- Complete wiring replacement
- Replacement of pipes for water supply, heating, sewerage
- Ventilation system device
- Installation of systems: "warm floor"
- Floor leveling (concrete screed)
- Laying artistic parquet, massive boards, etc.
- Alignment of walls and ceilings (plaster / putty)
- Installation of multi-level ceiling structures made of GKL and GKLV
- Laying tiles with decor, mosaics (walls/floors)
- Installation of Venetian/decorative plaster
- Painting walls and ceilings
- Installation of air conditioners / split systems
- Installation of plastic / wooden windows
- Installation of interior doors
- Wet cleaning of the premises of the house
10000

Not a specialist will not be able to correctly calculate the final cost of finishing a house, based only on the price list of finishing work. The thing is that there are works that are preparatory to finishing work, and about which a non-professional and amateur may not know. We are ready to meet our customers and discuss reasonable prices for repairs, so our prices for finishing work will suit you. In any case, we do not work at the expense of quality, and if we offer inexpensive prices for home repairs, we justify how we save.

Communications in the house from ITONG blocks

The construction of a house from ITONG blocks is carried out in stages, taking into account the needs of future residents. And the most important of the stages is - equipping it with utilities - heating, water supply and water purification, sewerage and processing of human waste products, electrics, antennas and the Internet, ventilation and smoke removal - this is not a complete list, and everything from one source with a single quality control and full warranty. The light is on, there is water, warmth and comfort in your home!

Constant monitoring of the engineering communications market and the study of production technologies and new equipment allow us to satisfy the most sophisticated needs of our customers in the engineering equipment of their country house. The Russian House team consists of highly qualified engineers and certified plumbers, the company's employees constantly improve their knowledge by taking specialized courses and trainings from companies that supply engineering equipment that we use in our projects. We are always looking for new opportunities to fulfill our tasks in providing comfort and coziness in your country house.

Projects of houses from ITONG blocks

Before you start building your house, you should consider as many layout options and sketches as possible and choose the best foam block project for your family. You can get acquainted with the proposed options and order the construction of a turnkey foam block house from the managers in our company. The projects of private country houses created by us have an expressive architectural style, are spacious, reliable and are made in accordance with all building standards and requirements for ecology and fire safety.


one-story 7.0 by 9.0
94 m2

construction from ITONG blocks
one-story 7.7 by 8.9
51 m2

construction from ITONG blocks
three-story 5.4 by 5.9
77 m2

construction from ITONG blocks
two-story 7.0 by 9.0
91 m2

construction from ITONG blocks
two-story 8.9 by 9.0
117 m2

construction from ITONG blocks
two-story 8.0 by 9.5
78 m2

construction from ITONG blocks
two-story 14 by 15
97 m2

construction from ITONG blocks
one-story 9.0 by 15
141 m2

construction from ITONG blocks
two-story 9.6 by 13
208 m2
4. Project
The layout was initially customized to meet specific requirements. The kitchen should be angular, one side should go to the entrance to the site and the area in front of the house, the second - towards the bath and the area in front of the bath. All this was done for my wife, because I see how hard it is for her to manage the house alone with her children. With this arrangement, she will be able to cook in the kitchen and observe almost the entire territory of the site so that she can let the children go for a walk. The area not covered by the view from the kitchen includes only two rear sides of the house, where the fence is 7 and 4 meters, respectively. The rest of the layout was drawn based on the location of the kitchen and the entrance to the house from the main (front) facade. Thus was born the layout of the 1st floor. I decided to make the second floor full-fledged, because I needed 3 rooms of a good size, a bathroom, and in the future there would be more than one. I didn’t make it an attic, because it’s more expensive to insulate and less volume, but I decided to make a cold attic, which can later be converted into an attic 3rd floor. For four, a fairly large house is obtained, although the usable area of ​​​​the first floor is just over 60 square meters. m. But firstly, we plan not to stop at two children, and secondly, it was already irrational to expand the boundaries of the house to increase the area due to the location on the site. In addition, the 2nd floor will remain cold and completely unfinished for financial reasons. And prepare 60 sq. m. for living it seems to me not a very difficult thing and I hope there will be enough finances to do it before the cold weather.
Floors of the first floor: anticipating this issue, I will write the following. Since the foundation was formed from the advice of experienced people and was calculated by the designer, it was not discussed. I have a plate with the ribs up. What can be done: overlapping is quite expensive, so I decided to simply fill the space between the ribs with sand to the required level. The price of the issue is 4 KAMAZ trucks of sand, 4 thousand rubles each. A screed would be needed on any floor, so I do not include it in the price. Well, more work. Let there be 20 thousand ready-made flooring for a screed with the ability to make small cavities for storing something. I did not consider a wooden floor, because I will do heating through underfloor heating without radiators. Yes, and the tree is more expensive, short-lived and requires care.
The design part of the project is missing, but here I used the support of Ytong - I used the album of technical solutions and consultations from the hotline and Ytong designers. All this is unusually free for the Russian layman, but knowing the German mentality, I don’t see a catch in this. I think the high cost of Ytong pays for all these services.
The result is a project that I painfully drew in with the simultaneous study of Archikad, which changed 100 times and still some points have not been determined. I must say that this has already had its effect at the construction site - I have an extra row of blocks on the 1st floor (the height of the floor along the outer side of the wall I got is 13 blocks or 3.25 meters. I plan to make a useful floor height of 2.95 m. You will get a thick floor (due to additional backfilling with sand).The main internal parameters are the height to the window sill in the living quarters and the kitchen - 90 cm (with the exception of the bathroom - 140 cm and the window 80 by 100 cm), the height of the windows is 150 cm, the width of the windows is from 130 to 200 cm depending on the layout Height from the ceiling to the upper edge of the window - 50 cm (2 blocks) I had not yet thought through ventilation and chimneys in the project, at the time of the start of construction, the need for all this dawned on me and I allocated space for two ventilation and chimney shafts and laid reinforcement in the ribs (outlets) to increase the ribs in the place where these shafts will be installed so that they can be built from bricks if necessary.
I provided communication inputs and outputs in the slab: 1 sewer, 1 backup sewer through which a plastic pipe with water will be introduced and 1 plastic pipe 40 mm for an electric cable. I plan to install a septic tank on finances at the end of construction, because this is not the most important thing for entering the house. In our bathhouse there is a toilet with a shower cabin (for the bath there is a separate septic tank). The cost of a septic tank with installation is about 100 thousand rubles. I learned from us in Kubinka - the production of septic tanks Yubas - Eurobion. He considered that it was more important to let the last 100 thousand to enter the house than to have a septic tank and stay on the street.
The overlap between the 1st and 2nd floors - reinforced concrete slabs. Fast, angry and reliable. The solution is unequivocal, if you imagine that there will be 3 children's rooms above your head. All life! I think there is no room for error in terms of soundproofing. And then it will be necessary to modify the floor of the 2nd floor.
The result - the project was done by myself (with the exception of the foundation), construction is planned in the mode of maximum rational savings.

5. Savings
Nobody believes me that for 1 million rubles I can build a house and live in it. I really can’t build a house for 1 million. But more than 1.5 million, I theoretically can’t find, so this is my life task. I have to say it's real. It is realistic in the sense that you need to understand where the money goes at the construction site and where you need to save. And I found this place. These are builders and payment for their work.
I met on the forum with, whose house is located 2 km from my village in the neighboring SNT. The house is good. Also 2 full-fledged floors, size 9x9. Ytong material. In two years, he invested about 3 million in it. And he already lives in it. And about 40% of this amount went to pay for the work. Thus, in reality, the house would have cost him no more than 2 million rubles if he had built it himself. And as you probably understood, I made a naive, in your opinion, decision to build myself. I agree that this is a utopia. But it is worth thanking God, because this plan began to slowly come true. I gave 25 thousand rubles for the foundation work. At the construction site, an Uzbek is constantly working for me at a rate of 1,000 rubles a day. But the bulk of the work is done by my father-in-law, whom I have already mentioned. Apparently this house will be at the same time a monument to him, because he really builds. I work on weekdays, leave for Moscow at 7-00 and arrive at the construction site at 19-30. Those who travel far to work will understand me, I arrive pretty tired. But I am joining in building, this is a house for me and my family, who now lives in a village with a toilet on the street and a Russian stove. This mode is very exhausting. I have already lost 7 kg in a month, despite the fact that I had almost no excess weight (well, maybe a maximum of 5 kg in the upper limit of the norm). I won’t say that it’s unhealthy, because now I’m fine, but there is a slight lack of sleep, because we work to the last, until the gnat completely overcomes. In total, with such forces it turns out to be erected under the floor of the 1st floor, taking into account the cost of work on the foundation - no more than 50 thousand rubles. I believe in a miracle! Probably my debt to my father-in-law in financial terms will be about half a million rubles, if he masters the whole house in this mode. And in moral terms, I am grateful to him for the rest of my life!
Bottom line - if you manage to build on your own, the economic plan for construction looks realistic.